SAJID ALI KHAN (M Tech Structures) Consulting Structural Engineer N.I.T. LIC.NO. 1940 N.M.C. LIC.NO.L -358 N.M.R.D.A. NO. – 324 1st fl Vali Manjil Gddigodam sq.,Nagpur FORM-2A [See MahaRERA Order No. ________] ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at end of the financial year) Date: 30.05.2025 To, TheSanjay Laxmanrao Narad, Proprietor of M/s Lifestyle Infrastructure Flat No. C/ 2-3-1, 3rd Floor, Radhakrishna Apartment, Chintamani Nagar, Nagpur-440025. Quality Assurance Certificate (Project Registration No. P50500055967 for the Year Ending 2025) Subject: Certificate for quality of materials used and quality of Construction and workmanship for the work of Priya Blossoms having MahaRERA Registration Number P50500055967 being developed by M/s Lifestyle Infrastructure. I/We Sajid Ali Khan have undertaken an assignment of supervision of this real estate project. Our Responsibility. To carry out the work in accordance with the development permission and as per the approved plan and submit certificate of supervision of work and to carry out matedal testing in-situ or in the authorized laboratory as per prevailing and applicable standards and to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and or other relevant code of practice. The details oI the quality are as follows: SAJID ALI KHAN (M Tech Structures) Consulting Structural Engineer N.I.T. LIC.NO. 1940 N.M.C. LIC.NO.L -358 N.M.R.D.A. NO. – 324 1st fl Vali Manjil Gddigodam sq.,Nagpur 1. Structural Design, Stability and Testing Sr Parameters Yes No Remarks No 1 Whether soil investigations of the site has Yes been conducted before the structural design and soil parameters have been accounted for in the structural design/ drawings? 2 Whether Structural Engineer has been Yes Sajid Ali Khan appointed for the Project? 3 Whether the lnspection Registers, Site order Yes book and Quality control Test registers are maintained at the site properly and endorsed by the Engineer-in-charge? 4 Whether testing facilities to check quality of Yes material is available at site? 5 Whether the statuary provisions for disaster No resistance / earthquake resistant design have been incorporated, Specially in case of multi-storeyed Construction? 6 Has suitable cognizance been taken on Yes demarcated flood lines and appropriate precautions taken for protecting the site from flooding considering local flooding issues? 2, Input Materials Sr Parameters Yes No Remarks No 1 Whether the following Building Materials Yes confirm to relevant IS/ BS/NBC code, or as per industry standards. If yes, provide details: (a) Cement, Concrete and Coarse Aggregate Yes (b) Steel and its alloys Yes (c) Electrical wire, fittings and accessories Yes SAJID ALI KHAN (M Tech Structures) Consulting Structural Engineer N.I.T. LIC.NO. 1940 N.M.C. LIC.NO.L -358 N.M.R.D.A. NO. – 324 1st fl Vali Manjil Gddigodam sq.,Nagpur (d) Plumbing and Sanitary Fittings Yes 2 Whether regular tests of materials and Yes construction products are being done from accredited labs also ? If yes, details of such labs 3 Whether manufacturer test certificate for Yes cement,steel, pipes etc. have been obtained with supplyand records are being maintained? 4 Whether Suitable water is being used for Yes construction i. What is the source of water ii. Has water been tested and approved by Engineer-in-charge before construction iii. Has water been tested subsequently as perRequirement 3. Quality of Workmanship Sr Parameters Yes No Remarks No 1 Whether works of all the electric d wntng/ No connections / lift installation / other electricalinstallations have been carried out underauthorized /registered electrical engineer and itsrecords has been maintained. 2 Whether all related works of plumbing & Yes sanitaryincluding installation of water supply systems,drainage systems, sewage systems, sinks, toiletsetc. have been carried out under authorized/registered plumbers / sanitary contractors andits records has been maintained. 3 Whether all the work is being carried out Yes undersupervision of experienced and skilled professional. Further, workmanship and SAJID ALI KHAN (M Tech Structures) Consulting Structural Engineer N.I.T. LIC.NO. 1940 N.M.C. LIC.NO.L -358 N.M.R.D.A. NO. – 324 1st fl Vali Manjil Gddigodam sq.,Nagpur qualityis satisfactory and up to the mark and the workhas been acceptable within the permissible limitsof deviations as per relevant code of practice. 4 Whether remedial measures are undertaken Yes toprevent Dampness & Leakages? If yes, providedetails 5 Whether safety precautions areduring Yes construction activities forworkers? Undertakenall type ofSrNo 4. Miscellaneous Sr Parameters Yes No Remarks No 1 Whether third party quality inspection is Yes beingcarried out on site during/after completion of theworks. If yes, provide details 2 Whether anti-termite treatment has been Yes undertaken for the soil? 3 Whether fire-fighting arrangements has been Yes undertaken under supervision of fire consultant? 4 Whether proper signages have been installed Yes onsite/ completed building as per requirement. 5 Whether precautions are undertaken to Yes avoid airpollution during construction? Please specify.