SAJID ALI KHAN (M Tech Structures) Consulting Structural Engineer N.I.T. LIC.NO. 1940 N.M.C. LIC.NO.L-358 N.M.R.D.A. NO. -324 1A Vali Manjil Gddigodam sq.,Nagpur Annexure B FORM 2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submited at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project Wise) Date: 31·|22025 To, Sanjay Laxmanrao Narad Nagpur, MAHARASHTRA,440025 Subject: Certificate of Cost Incurred for Development of Priya Blossoms having MahaRERA Registration Number P50500055967 (Only Applicable after project Registartion) being developed by Sanjay Laxmanrao Narad Sir, IWe Sajid Ali Khan have of Certfying Estimated Cost for Priya Blossoms having MahaRERA Registration Number P50500055967 (Only Applicable after project Registration, being developed by Sanjay Laxmanrao Narad ) 2.We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreements of sale. Our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer / Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, the assumption ofthe cost of material, labour and other inputs made by developer,and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total estimated the Cost of completion of thc aforesaid project under reference at Rs. 38300000.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to thc Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & extemal works, as per specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certificate / completion certificate for the Building(s) Wing(s) Layout /Plotted Development from the Nagpur Municipal Corporation being the Planning Authority under whose jurisidiction the aforesaid project is being implemented. 4.The Estimated Cost incured till date is calculated at Rs. 35124000.00 (Total of Table A and B).The amount of Estimated Cost incurred is calculated on the basis of input materials/services used and unit cost of these items. 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate Complition of internal & external works, as per specification mentioned in agreement of sale, of the Page 1 of 4 Project is estimated at Rs 3176000.00 (Total of Table A and B) proportionate ate internal & Cost of the Civil, MEP and allied works the for the apartments and 6. Icertify that the as completed on the date per specification mentioned in agreement of sale, of the aforesaid Project external works,as of this certificate is as given in Table A and B below: Table-A bearing Number :Priya Blossoms/NA Building/ Wing /Layout Plotted Development Amount (In Rs.) Particulars Sr. No. Total Estimated Cost of the Building/Wing/Layout Plotted Development as on date of Registration is olo 2 Cost incurred as on date of certificate estimated cost) 3 Work done in Percentage (as Percentage of the Cost) Balance Cost to be Incurred*(Based on Estimated 0 items not included in the 5 Cost Incurred on the Additional/Extra Estimated Cost (Table-C) Page 2 of 4 Table B Development Works in respect of the Registered Phase Internal and External Amount (In Rs.) Particulars Sr. No. 38300000.00 (1) Total Estimated Cost of the BuildingWing/Layout Registratiorn is Plotted Development as on date of 35124000.00| certificate 91.71 2 Cost incurred as on date of percentage of the estimated cost) Work done in Percentage (as 3176000.00 3 on Estimated Cost) Balance Cost to be Incurred(Based Additional/Extra items not included in the 5 Cost Incurred on the Estimated Cost (Taplc -C) Yours Faithfully SAJID ALI KHAN M.Tech. (Structures) NIT Lic No.1949 NMC Lic No.358 SAJID ALI KHAN LETTERS) with Stamp of Engineer Signature & Name (IN BLOCK per Scction 2(u) of thc Act) Degree Holder or equivalent as [Not Less than bachelor's applicable) Local Authority license no. 1940 (if 0ate pf Setifiçate: CiSnd Kgree Gure Signatured Promotếr Laxmanrao Narad Name: Date: Sanjey time to time and as Estate Project as per drawings approved from 1.The scope of work is to complete Registered Real in agreement of sale. per specifications mentioned Quantity Surveyor, whose done by an independent office of Engineer or can be 2.(*)Quantity suvey can be done by appointed by Developer, the name has to be mentioned quantity surveyor being in the Engineer,the name of the person independent certificate of In case of calculated by ofice of in case quantity are being at the place marked (")and mentioned at the place marked (). responsible for the quantity calculated should be office of Engineer,who is estimated Cost (1) and Actual Difference between Total to be incurred (4) may vary from cost, any 3.(**) Balance Cost quantity required / escalation of cost etc. As this is an estimated due to deviation in of the cost Cost incurred (2) Project will result in amendment required for development of the Real Estate deviation in guantity incurred / to be incurred. specifications are indicative and not exhaustive 4.All components of work with Example: Any deviations in input material used from 5.Please specify if there are any deviations /qualifications. specifications in agreement of sale. Page 3 of 4 TABLE C List of ExtralAdditional/Deleted Items considered in Cost. (which were not part of the original Estimate of Total Cost) Page 4 of 4