SAJID ALI KHAN (M Tech Structures) Consulting Structural Engineer N.J.T. LIC.NO. 1940 N.M.C. LIC.NO.L -358 N.M.R.D.A. NO. -324 1f Vali Manjil Gddigodam sq.,Nagpur Annexure B FORM 2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project VWise) Date: 3o o9.2025 To, Sanjay Laxmanrao Narad Nagpur, MAHARASHTRA,440025 Subject: Certificate of Cost ncurred for Development of Priya Blossoms having MahaRERA Registration Number P50500055967 (Only Applicable after project Registartion) being developed by Sanjay Laxmanrao Narad Sir, IWe Sajid Ali Khan have of Certifying Estimated Cost for Priya Blossoms having MahaRERA Registration Number P50500055967 (Onily Applicable after project Registration, being developed by Sanjay Laxmanrao Narad ) 2.We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of intermal & external works of the project as per specifications mentioned in agreements of sale. Our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer / Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, the assumption ofthe cost of material,labour and other inputs made by developer,and the site inspection carried out by us to ascertain / confirm the above analysis given tO Us. 3. We estimate Total estimated the Cost of completion of thc aforesaid project under reference at Rs. 38300000.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to thc Civil, MEP and Allied works required for completionof the apartments and proportionate completion of internal & external works,as per specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certificate / completion certificate for the Building(s) Wing(s)) Layout /Piotted Development from the Nagpur Municipal Corporation being the Planning Authority under whose jurisidiction the aforesaid project is being implemented. 4.The Estimated Cost incured till date is calculated at Rs. 26931000.00 (Total of Table A and B).The amount of Estimated Cost incurred is calculated on the basis of input materials/services used and unit cost of these items. 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate Complition of internal & external works, as per specification mentioned in agreement of sale, of the Page 1 of 4 Project is estimated at Rs 11369000.00 (Total of Table A and B) 6.Icertifty that the Cost of theCivil, MEP and alled works the for the apartments and proportionate ate internal & external works,as per specification mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: Table-A Building/ Wing Layout Plotted Development bearing Number :Priya BlossomsNA Sr. No. Particulars Amount (In Rs.) 1 Total Estimated Cost of the BuildingWing/Layout Plotted Development as on date of Registration is 2 Cost incurred as on date of certificate 3 Work done in Percentage (as Percentage of the estimated cost) 4 Balance Cost to be Incurred(Based on Estimated Cost) 5 |Cost Incurred on the Additional/Extra items not included in the Estimated Cost (Table-C) Page 2 of 4 Table B Internal and External Development Works in respect of the Registered Phase Sr. No. Particulars Amount (In Rs.) (1) Total Estimated Cost of the Building/Wing/Layout 38300000.00 Plotted Development as on date of Registration is 2 Cost incurred as on date of certificate 26931000.00 Work done in Percentage (as percentage of the estimated cost) 70.32 4 Balance Cost to be Incurred*(Based on Estimated Cost) 11369000.00 5 Cost Incurred on the Additional/Extra items not included the |Estimated Cost (Tablc -C) Yours Faithfully SAJID ALIKHAN M.Tech. (Structures) NIT Lic No.1940 SAJID ALI KHAN NMC Lic Ne.358 Signature & Name (IN BLOCKLETTERS) with Stamp of Engineer [Not Less than bachelor's Degree Holder or equivalent as per Scction 2(u)of thc Act] LocalAuthority license no. 1940 (if applicable) Date of Certificate: Liestlalnyrasțraassure .Signătufe Name: Sanjay Laxmanrao Narad Date: 1.The scope of work is to complete Registered Real Estate Projectas per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2.(*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (")and in case quantity are being calculated by office of Engineer,the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked ("). 3.(**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required /escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred /to be incurred. 4.Allcomponents of work with specifications are indicative andnot exhaustive 5.Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. Page 3 of 4 TABLEC List of ExtralAdditional/Deleted Items considered in Cost. (which were not part of the original Estimate of Total Cost) Page 4 of 4