S.B. Malode & M:09975896517 e-mail : sudesh.malode@rediffmail.com NIT Ls No. 2791, NMRDA Ls No. 360, NMC Ls No. 704 Government of Maharashtra Ls No. STATE/RI2}211APL116614 Annexure B FORM 2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of ongoing Project and for withdrawal of Money from D;;;r* o.*r*-rrlj* *,""1 Date: 18.04.2026 To, C.CRAFT INFRA PRIVATE LIMTTED Nagpur, MAHARASHTRA,440025 subject: certificate of cost lncurred for Development of sHREyAS lNslGlNA having MahaREM Registration Number P50500055966 (only Applicable after project Registartion) being developed by c.cRAFT INFM pRtvATE LIMITED Sir, l^ffe SUDESH MALODE have of certifying Estimated cost for sHREyAs lNslclNA having MahaREM Registration Number P50500055966 (Only Applicable after project Registration, being devetoped by C.CRAFT TNFRA pRIVATE LIMITED ) 2'we have Estimated the cost of civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreements of sale' our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer / consulatants. The schedule of items and quantity required for the entire work as calculated by Quantity surveyor* appointed by Developer/Engineer, the assumption ofthe cost of material,labour and other inputs made by developer,and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3' we estimate Total estimated the cost of completion of thc aforesaid project under reference at Rs. 53000000.00 (Total of rable A and B) at the time of Registration. The estirnated rotal cost ofproject is with reference to thc civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works'as per specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certificate / completion certificate for the Building(s) /wing(s)/ Layout /plotted Development from the Nagpur Municipal corporation being the Planning Authority under whose jurisidiction the aforesaid project is being implemented 4'The Estimated cost incured till date is calculated at Rs. 52940000.00 (Total of rable A and B).The amount of Estimated cost incurred is calculated on the basis of input materials/services used and unit cost of these items. Page 1 of4 Flat No. 101, Plot No. 214, Swagat Complex, Oppo. Global City Hospital, Near Sakkardara Police Station, Sakkardara Square,Om Nagar Nagpur- 440024 5' The Balance cost of completion of the civil, MEP and Aflied proportionate complition works for compretion of the of internal & external works, apartments and Project is estimated at as per specification mentioned in agreement Rs 60000.00 (Total of Table of sare, of the A and B) 6' r certify that the cost of the civir, MEp and aried works the for th ffi[:Jl,'""Tt:J;[::Ti:Ttr*;Xlff"",entorsae, "':,:T:[::[;ffi"i"L,:liLflLf:'fl.: Table.A Es,limated Cost of ttre 33,i,LJffo'U8$ g Page 2 of 4 Table B Internal and Externat Ilrglks in respect of the Total Eslimated Cost of the iterns not included in the Yours Faithfully 5.8. ASSOCIA.IeS .O$ULNXO l/l.Tech EiIGI}I€ERS r STRUCTURAT OE$IGNE. \lT [.s No. 2791/NMRDA Ls No.360, ltMC Ls No.7ri ' SUDESH MAL'DE GOW MAH. Lr. No.STATElRt2OZslApU166t S i s n atu re & Na me r, * r rBB? rtqliilffi ,,[ ffimH;n::n' "''' [Not Less than bacheror's Degree Horder or equivalent as per scction 2(u) of thc Act] Local Authority ticense no, STATE/R/ZOZSiApU16614 (if appticabte) 18.04.2026 E LIMITED Signature ^.ruu+z DIRECTON Name: C-CRAFT INFRA ATE LIMITED 31.03.2026 1'The scope of work is to complete Registered Real Estate Project as per drawings per specifications mentioned in approved from time to time and as agreement of sale. 2'(*) Quantity survey can be done by office of Engineer or can be done by an independent certificate of ln case of independent quantity euantity surveyor,whose surveyor being appointed by Developer, at the place marked (*) and in case quantity the name has to be mentioned are being calculated by office of Engineer,the office of Engineer' who is responsible name of the person in the for the quantity calculated should be mentioned at the place marked (*). 3'(*.) Balance cost to be incurred (4) may vary from Difference between Total estimated cost (1) and Actual cost incurred (2) due to deviation in quantity required / escalation of cost etc. As deviation in quantity required for development this is an estimated cost, any of the Real Estate project will result in incurred / to be incurred. amendment of the cost 4'All components of work with specifications are indicative and not exhaustive 5'Please specify if there are any deviations / qualifications. Example: Any deviations in input specifications in agreement of sale. material used from Page 3 of 4 I TABLE C List of Extra/Additional/Deleted ltems considered in Gost. (which were not part of the original Estimate of Total Cost) Page 4 oI 4