S.B. Malode &Associates M:099775896517 e-mail : sudesh.maloderediffmail.com NIT LS No. 2791, NMRDA Ls No. 360,NMC LsNo. 704 Government of Maharashtra Ls No. STATE/RI2025/APL/16614 Annexure B FORM 2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project Wise) Date: o.o9-2025 To, C-CRAFT INFRA PRIVATE LIMITED Nagpur, MAHARASHTRA,440025 Registration Subject: Certificate of Cost Incurred for Development of SHREYAS INSIGINA having MahaRERA C-CRAFT INFRA PRIVATE Number P50500055966 (Only Applicable after project Registartion) being developed by LIMITED Sir, having MahaRERA Registration I/We SUDESH MALODE have of Certifying Estimated Cost for SHREYAS INSIGINA C-CRAFT INFRA PRIVATE Number P50500055966 (Only Applicable after project Registration, being developed by LIMITED) 2.We have Estimated the cost of Civil, MEP and allied works required for completion of the apatments and proportionate completion of internal & external works of the project as per specifications mentioned in agreements of sale. Our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer/Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, the assumption ofthe cost of material,labour and other inputs made by developer,and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total estimated the Cost of completion of thc aforesaid project under reference at Rs. 53000000.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to thc Civil. MEP and Allied works required for completion of the apartments and proportionate completion of internal &external works.as per specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certificate / completion certificate for the Building(s) MWing(s)/ Layout /Plotted Development from the Nagpur Municipal Corporation being the Planning Authority under whose jurisidiction the aforesaid project is being implemented. 4.The Estimated Cost incured till date is calculated at Rs. 39404000.00 (Total of Table A and B),The amount of Estimated Cost incurred is calculated on the basis of input materials/services used and unit cost of these items. Page 1of 4 Flat No. 101, Plot No. 214, Swagat Complex, Oppo. Global City Hospital, Near Sakkardara Police Station, Sakkardara Square,Om Nagar Nagpur- 440024 completion of the apartments and 5. The Balance Cost of Completion of the Civil, MEP and Allied works for specification mentioned in agreement of sale, of the proportionate Complition of internal & external works, as per Project is estimated at Rs 13596000.00 (Total of Table A and B) apartments and proportionate ate internal & 6. Icertify that the Cost of the Civil, MEP and allied works the for the Project as completed on the date external works,as per specification mentioned in agreement of sale, of the aforesaid of this certificate is as given in Table A andB below: Table-A Building/Wing /Layout Plotted Development bearing Number:SHREYAS INSIGINA/NA Sr. No. s Particulars Amount (In Rs.) 1 Total Estimated Cost of the Building/Wing/Layout |Plotted Development as on date of Registration is 0 2 Cost incurred as on date of certificate 3 Work done in Percentage (as Percentage of the estimated cost) 4 Balance Cost to be Incurred**(Based on Estirmated Cost) 5 Cost Incurred on the Additional/Extrå items not included in the Estimated Cost (Table-C) Page 2 of 4 Table B Internal and External Development Works in respect of the Registered Phase Sr. No. Particulars Amount (In Rs.) (1) 1 Total Estimated Cost of the Building/Wing/Layout 53000000.00 Plotted Development as on date of Registration is 2 Cost incurred as on date of certificate 39404000.00 3 |Work done in Percentage (as percentage of the estimated cost) 74.35 4 Balance Cost to be Incurred**(Based on Estimated Cost) 13596000.00 5 Cost Incurred on the Additional/Extra items not included in the Estimated Cost (Tablc -C) S.B. MALODE& ASSOCIATES Yours Faithfully M.Tech CNSULTING ENGIERS & STRUCTURAL DE: VIT LS No. 2791/NMRDA LS No.360. NMC Ls GOVT MAH. Ls. No.STATEIRI2025/4P: SUDESH MALODE akkardara Poice Station, ? Signature &Name (IN BLOCK LETTERS) with Stamp of Engineer [Not Less than bachelor's Degree Holder or equivalent as per Scction 2(u) of thc Act] Local Authority license no. STATE/RI2025/APL/16614 (if applicable) Date of Certificate: So"o92o25 Agreed and Accepted by: c-GRAFT INFRA PRIVATE LIMITED Signrer of Rrtr Nahe c-CRAFT INFRA PRIVATE LIMITED Date: DIRECTOR 1.The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2.(") Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor,whose certificate of In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (")and in case quantity are being calculated by office of Engineer,the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked ("). 3.(**) Balance Cost to be incurred (4) may vary from Diference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the RealEstate Project willresult in amendment of the cost incurred /to be incurred. 4.All components of work with specifications are indicative and not exhaustive 5.Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. Page 3 of 4 TABLEC List ofExtralAdditional/Deleted Items considered in Cost. (which were not part of the original Estimate of Total Cost) Page 4 of 4 Station, Sakkardara Squa