$ .it Er. Dhowol Horshe e.E (civit) +9t 9't5885500S e dhowol.horshe6tgmoil.com I 0ivins =:P5g*;; FORM.2A [See Regulation 3A.] ENGINEERS'S CERTIFICATE FOR QUALITY ASSURANCE (Sile Superviso/s Certifi cate (To be submitted at the end of Financiat Year) Date:31/03/2026 To, OM SAI HOUSING AGENCY Nagpur, MAHARASHTRA,440008 Qual ity Ass ura nce Certifi cate (Certificate No. ......................for the Year Ending ..... ...............) Subiect Certificate for quality of materials used and quality of Constuction and workmanship of the work of SAI NAGARI having MahaRERA Registration Number P50500066541 being developed by Oll SAt HOUSTNG AGENCY. Sir, lA/Ve Dhawal Harshe have undertaken an assignment of supervision of this real estate proyect Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of nork, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows : 1. Structural Design, Stability and Testing Sr. No. Parameters Yes/No Remarks 1 \Aftether soil investigations of the site has been No Not Applicable conducted before the structural design and soil parameters have been accounted for in the structural design/drawings? 2 \Mether Structural Engineer has been appointed for No Not Applrcable the project? 3 \Mether the inspection registers, site order book No Applicable and quality controltest registers are maintained at the siteproperly and endorsed by the Engineer-in- Charge? 4 Whether testing facilities to check quality of material No Yot A is available at site? 'Fiiiii,:,:u*) ffi ice Address Office No.40l, Vinoyok Aportments, centrot ERUBJ d&ony, Plot No. 9, Flot No., t : ,'t-- Ittt lt \ Gorden, Chhotropoti Squore, Nogpur - 400015 Opp.. Sovorkor Gor *i;, .com @ +91 9158855115 $ divineprojects24@gmoil.com Parameterc Remarks \A/hether the statuary provisions for disaster fot Applicable resistancelearthquake resistant design have been incorporated, specially in case of multi-storeyed construction? Has suitable cognizance been taken on demarcated flood lines and appropriate precautions taken for protecting the site from flooding considering local 2. lnput Materials Sr. No. Parameters Yes/No Remarks 1 \Mrether the folbwing building materials confirm to yes relevant IS/BS/NBC Code, or as per lndusty Standards? lf yes, provide details. (a) Cement, concrete and coarse aggregate yes (b) Steel and its alloys yes (c) Electricalwire, fittings and accessories yes (d) Plumbing and sanitary fittings yes 2 \Mether regular tests of materials and construction yes products are being done ftom accredited labs also? lf yes, details of such labs 3 \Mrether manufacturer test certificate for cement, No steel, pipes etc. have been obtained and whether supply records are being maintained? 4 \Mrether suitable water is being used for yes construction? (i) Vvhat is the source of water? yes (ii) Has water been tested and approved by yes Engineer-in-Charge before construction? (iii) Has water been tested subsequently as per yes requirement? 3. Quality of Wod