Divins & Er. Dhowol Horshe e.e (civir) +91 915885500S @ dhowol.horshe6ogmoil.com I ;,"1ffi.15S]i"ffi Annexure A FORM 1 [see Regulation 3l ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date:3llo,312026 To, OM SAI HOUSING AGEIVCY NAGPUR, MAIIARASHTRA, 44OOO8 Subject : Certificate of percentage of Work of completion of construction work of SAI NAGARI having MahaRERA Registration Number P5O5OOO66541 Situated on The Land Bearing Kh.No. 05, P.H.NO. 37, touza - vihirgaon , Tah. - Nagpur(bf , Dist. - Nagpur, being developed by OU SAI HOUSING AGtNCy Sir, I/We AR DIIAWAL IIARSHE have undertaken assignment as Architect /Licensed Surveyor of certiffing Percentage of completion of Construction Work of 561 NAGARI having MahaRERA Registration Number P5O5OOO66541 being developed by OM SAI HOUSING AGENCY ) Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. ,--it- :: 'l :l :i ,: :: ptot No. 9, Ftot No. 40t, Vinoyok Aportments, centfdtxbP{t corony, Opp. Sovorkor Gorden, Chhotropoti Squore, Nogpur - 400015 @ www.EEEEEEMII.com @ +91 9158855115 Q divineprojects24@gmoil.com Table A Layout/ Building/trIing ilumber: IIA Plot Without Stnrcture Sr. Tasks/Activity Percentage of No. Actual Work Done (As on date of the Certificate) (1) (21 (3) 1 Excavation NA 2 Basements (if any) NA 3 Podiums (if any) NA 4 Plinth, NA 5 Stilt Floor NA 6 Slabs of Super Structure NA 7 Internal walls, Internal plaster, Floorings, Floors NA and windows within Flats/Premises 8 Sanitary Fitting within the Flat/Premises NA 9 Staircases, lifts Wells and Lobbies at each Floor NA level Overhead and Underground Water Tanks 10 External plumbing and external plaster, elwation, NA completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ol NA environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound WaIl and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Page 2 of3 Table B - Gommon Areas (lnternal and Exte_rnal Development Wor*s) in respect of Registered Phase / Project Number) Sr.N Common areas and Is Pcrccntage of Details o feciHties Available Ac{ual Work (Yes/ltof I)one (As ' onthedate of Certificatel (U l2l (31 (4) (s) 1 Internal Roads & Footpaths Yes lOOo/o 2 Water Supply Yes lOOo/o As pgr I sanctron 3 Sewerage (Chamber, Lines, Septic Yes IOOo/o plan I I Tank, STP) 4 Storm Water Drains Yes lOOo/o 5 Landscaping & Tree Planting Yes lOOo/o 6 Street Lighting Yes IOOo/o 7 Communit5r Buildings NA NA NA 8 Treatment And Disposal Of Sewage Yes lOOo/o As per And Sullage Water sanctlon plan 9 Solid Waste Management And Disposai NA NA NA 10 Water conservation /Rain water Yes 94Vo As per hanresting sanctlon plan 11 Energr management NA NA NA t2 Fire protection and fire safety NA NA NA requrrements 13 Electrical meter room, sub-station, Yes 8Oo/o As oer receiving station sanction of MSEB l4 Others(option to add more) An,{.i< Xir NA NA NA Yours Fatthfully 7ry W License Engineer/ A*ehiteet Name: - SHRI. DIIAWAL S. I{ARSHE (N.M.R.D.A. License I{o- 61) (I{.I.T. License No- 3OOO| Agreed and accepted by: Name: OM SAI HOUSING AGENCY Date: 3llo,3120.26 Page 3 of3