Er. Dhowol Horshe B.E (civil) ea +9t 9158855005 O dhowol.horshe@gmoil.com e Divine PROIECTS - - Annexure A FOR"I,I I [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date:30106l2024 To' OM SAI HOUSIIYG AGENCY IIAGPUR, MAHARASHTRA, 44OOO8 Subject : Certificate of percentage of Work of completion of construction work of SAI ITAGARI having MahaRERA Registration Number P5O5OOO66541 Situated on The Land Bearing Kh.IVo. ()5, P.H.IYO. 37, Uouza - Vlhlrgaon , Tah. - lYagpur(Gl, Dist. - I[agpur, being developed by OM SAI HOUSIIYG AGEHCY Sir, l/We AR DHAWAL HARSHE have undertaken assignment as Architect /Licensed Surveyor of certi$ing Percentage of completion of Construction Work of SAI MGARI having MahaRERA Registration Number P5O5OOO66541 being developed by OM SAI HOUSIIIG AGEIYCY ) Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certi$ that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activigr of the entire phase is detailed in Table B. Office Address Plot'No.9, FIot No.40l, Vinoyok Aportments, centrol tub6@olony, Opp. Sovorkor Gorden, chhotropoti squore, Nogpur - 400015 O +9t glSgBSSllS e divineprojects24@gmoil.com Table A Layout/Bu drng/Wing ltumber: NA Plot ffithout Structure Sr. Tesks/Activity Perccntage of IYo. Actual Work Done (As on date of the Certificate) (1) (21 (3) I Excavation NA 2 Basements (if any) NA Podiums (if any) NA 4 Plinth, NA 5 Stilt Floor NA 6 Slabs of Super Structure NA 7 Internal walls, Internal plaster, Floorings, Floors NA and windows within Flats/ Premises 8 Sanitary Fitdng within tJ:e Flat/Premises NA 9 Staircases, lifts Wells and Lobbies at each Floor NA level Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, NA completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical frttings, mechanical equipment, compliance to conditions oI NA environment/CRz NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound WaIl and all other requirements as may be required to complete project as per specifications in agreement of Sale- Any other activities. Paqe 2 of3 Table B - csnmon Areas (lntemal and Exte_rnal Development works) in respect of Registered Phase / Project Number) Sr-f, Common areas and Is Perceatege of Detalls o facilities Available Actual Work (Yes/IYol Done (As ' on date of the Certifrcatel (u l2l (3) (41 (s) 1 Internal Roads & Footpaths Yes Oo/o As per sanctlon plan 2 Water Supply Yes Oo/o 3 Sewerage (Chamber, Lines, Septic Yes Qo/o Tank , STB 4 Storm Water Drains Yes Oo/o 5 l.andscaping & Tree Planting Yes OYo 6 Street Lighting Yes ov" 7 Community Buildings NA NA NA 8 Treatment And Disposal Of Sewage Yes OYo As per And Sullage Water sanctlon Dlan 9 Solid Waste Management And Disposal NA NA NA 10 Water conservation /Rain water Yes Oo/" As per harvesting sanctlon plan 11 Ener5/ managemcnt NA NA NA 12 Fire protection and l-rre safety NA NA NA requtrements 13 Electrical meter room, sub-station, Yes Oo/o As per receiving station sanctron ol- MSEB t4 Offign to add more) NA NA NA ,i Yours .; Wvtil.@ Licease Engineei f*ehitoe+ IYeme: - SIIRI. DHAW/IL S. HARSHE (IiI.M.RD.A. Llcense lYo- 611 (II.I.T. License lto- 3OOOI Agreed and accelted by: 4t**r^ @L Stgnatule of Prorooter IIame: OU SAI HOUSmc AGEITCY Date:3Olo612o.24 - Page 3 of3