Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date:11/04/2026 To, PRABHAT JANAK GARG, CHANDANA JANAK GARG AND VIKAS JANAK GARG NAGPUR, MAHARASHTRA, 441001 Subject : Certificate of percentage of Work of completion of construction work of BRINDABAN ELITE having MahaRERA Registration Number P50500056026 (Only Applicable after project Registartion) being developed by PRABHAT JANAK GARG, CHANDANA JANAK GARG AND VIKAS JANAK GARG Sir, I/We AGRASEN ARCHITECTS have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of BRINDABAN ELITE having MahaRERA Registration Number P50500056026 (Only Applicable after project Registration, being developed by PRABHAT JANAK GARG, CHANDANA JANAK GARG AND VIKAS JANAK GARG ) Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Layout/Building/Wing Number: NA Plot Without Structure Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. 10 External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/wing. 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks Page 1 of 3 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 8 Sanitary Fitting within the Flat/Premises 7 Internal walls, Internal plaster, Floorings, Floors and windows within Flats/Premises 6 Slabs of Super Structure 5 Stilt Floor 4 Plinth, 3 Podiums (if any) 2 Basements (if any) 1 Excavation Page 2 of 3 Table B - Common Areas (Internal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities Is Available Percentage of Actual Details (Yes / No) Work Done (As on date of the Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & Footpaths Yes 91.00 AS PER SANCTIONED LAYOUT PLAN 2 Water Supply Yes 54.00 CORPORATIO N WATER SHALL BE PROVIDED 3 Sewerage (Chamber, Lines, Septic Tank , STP) Yes 85.00 AS PER SANCTIONED LAYOUT PLAN 4 Storm Water Drains Yes 52.00 AS PER SANCTIONED LAYOUT PLAN 5 Landscaping & Tree Planting Yes 21.00 AS PER SANCTIONED LAYOUT PLAN 6 Street Lighting Yes 52.00 AS PER SANCTIONED LAYOUT PLAN 7 Community Buildings No 0.00 NA 8 Treatment And Disposal Of Sewage And Sullage Water Yes 12.00 AS PER SANCTIONED LAYOUT PLAN 9 Solid Waste Management And Disposal Yes 8.00 AS PER SANCTIONED LAYOUT PLAN 10 Water conservation /Rain water harvesting No 0.00 NA 11 Energy managemcnt No 0.00 NA 12 Fire protection and fire safety requirements No 0.00 NA 13 Electrical meter room, sub-station, receiving station Yes 73.00 AS PER SANCTIONED LAYOUT PLAN 14 Aggregate area of recreational Open Space Yes 81.00 AS PER SANCTIONED LAYOUT PLAN 15 Open Parking No 0.00 NA Yours Faithfully AGRASEN ARCHITECTS Signature & Name (IN BLOCK LETTERS) of L.S/ Architect ( License No: CA/2009/43942) Date of Certificate:11/04/2026 Agreed and accepted by: Signature of Promoter Name: PRABHAT JANAK GARG, CHANDANA JANAK GARG AND VIKAS JANAK GARG Date:11/04/2026 Page 3 of 3