PRAKASH SATGHARE &ASS0CIATES NIT LIC No. 2590 302,Sai Anand Apartment, Beltarodi, Nagpur -27 Date: Form - 2 [See Regulation 3] Engineer's Certificate (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Account - Project Wise) Date: 08/02/2024 To, M/s Nupur Constructions Plot No 40, Deo Nagar Khamla Road, Nagpur "Bharat Residency " for Subject: Certificate of Cost incurred for Development of Constructions situated on Plot No construction of one residential building of the M/s Nupur Ltd Hazari Pahad, P. H. No 7, bearing City 77, 77A & 78, Jai Krupa Nirman Sakhari Sanstha demoCrated by its boundaries as below, Servey No 23, 24, Sheet No 178 and Ward No 68, 440007, admeasuring 960.322 Sgmt. Area being Taluka & District:Nagpur, Maharashtra, Pin developed by M/s Nupur Constructions. of the end points) Demccrated By its boundaries (Longitude & Latitude On the EAST: Open Space On the WEST:Plot No 79 JYeiuz 6ungnsuog On the NORTH:Road PRAKASHSATGHAKE ConsultingEngineet On the SOUTH: Open Space L&MoN.LT.2590 Number Ref: MahaRERA Registration certifying Estimated cost for the subject Real Estate /We have undertaken assignment of construction of One Resdintial Building of the M/s Nupur named "Bharat Residency" for the Sanstha Ltd & 78, Jai Krupa Nirman Sakhari Constructions situated on Plot No 77, 77A No 178 and Ward No 68, City S ervey No 23, 24, Sheet Hazari Pahad, P. H. No 7, bearing Maharashtra, Pin 440007, Taluka & District: Nagpur, democrated by its boundaries as below, Constructions. developed by M/s Nupur admeasuring 960.322 Sqmt. Area being PRAKASHSATGHARE &ASSOCIATES NIT LIC No. 2590 302, Sai Anand Apartment, Beltarodi ,Nagpur -27 Date : On the EAST :Open Space On the WEST: Plot No 79 On the NORTH:Road On the SOUTH:Open Space Owner/Promoter 1.Following Technical Professionals are appointed by () Shri Prakash Satghareas L.S Architect (i) Shri Prakash Satghareas Structural Engineer (ii) Shri Kailash Verma as Site Supervisior completion of the Civil, MEPand Allied works required for 2. We have estimated the cost of the project as per apartments and proportionate completion of internal & external works of sale. Our es tmated cost calculations are based on specifications mentioned in agreement of reference by the available to us for the project under the drawings/plans made quantity required for the entire work as Developer/Consultants. The schedule of items and other inputs made and the assumption of the cost of material, labour and calculated by us, inspection carried out by s by the developer, and the site under reference Estimated Cost of completion of tihe aforesaid project 3. We estimate Total fregistration. The estimated Total 6,10,00,000.00 (Total of Table A and B) at the time o at Rs required for completion of reference to the Civil, MEP and allied works cost of project is with works of the project as proportionate completion of internal & external the apartments and purpose of obtaining mentioned in a greement of sale and for the per specifications the being the planning certificate/completion certificate for the Buildings from Occupation being implemented. jurisdiction the aforesaid project is Authority under whose Table A and B).The date is calculated at Rs. 0.00 (Total of 4. The estimated cost incurred till usedAARE calculated on the basis of input materials /services Consulting PRAKASH Engineer amount of Estimated cost incurred is No.NJ. T.2590 these items. and unit cost of coöletion allied works r equired for of the Civil, MEP and 5. The balance cost of completion of the project internal & external works proportionate completion of of the apartments and Project is estimated at Rs. mentioned in agreement of sale, of the as per specifications B) 6,10,00,000.00(Total of Table A and PRAKASH SATGHARE&ASSOCIATES NIT LIC No. 2590 302, Sai Anand Apartment, Beltarodi, Nagpur -27 Date: 6. I certify t hat the cost of the Civil, MEP and allied works for the apartments and proportionate internal & external works , as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and below: TABLE A Building/Wing bearing Number 1 or called Bharat Residency (to be prepared separately for each Building /Wing /Layout/Plotted Development of the Real Estate Project) Sr. Particulars Amsunts No. 1 Total Estimated cost of the build ings/wings as On date of Registration is 5,05,60,000.00 2 Cost incurred as on date of certificate 3. Work done in Percentage (as Percentage of the estimated cost) 0.00% 4 Balance Cost to be Incurred** (Based on Estimated Cost) 5,05,60,000.00 5 Cost Incurred on Additional /Extra Items not Included in the Estimated Cost (Table - C) PRAKASHSATGHANE ConsultingEngineet LAMaNLI2590 TABLEB Internal & ExternalDevelopment works in respect of the Registered Phase Sr. Particulars Amounts No. 1 Total Estimated cost of the internal an d external Development Works including amenities and facilities 1,04,40,000.00 in the layout as on date of Registration is 2. Cost incurred as on date of certificate 0.00 3. Work done in Percentage (as Percentage of the 0.00% PRAKASHSATGHARE &ASSOCIATES NIT LIC No. 2590 302, Sai Anand Apartment,Beltarodi ,Nagpur - 27 Date: Work done in PerCentage (as Percentage of the 0.00% estimated cost) Balance Cost to be Incurred** (Based on Estimated Cost) 1,04,40,000.00 Cost Incurred on Additional /Extra Items not Included in the Estimated Cost (Table - C) 0.00 Yours faithfully, Name :Prakash Satghare Local Authority License No. 2590 Agreed arnd Accepted by: FOR NUPURCONSTRUCTION Signature of Promoter OR Narme: Mr. Monish Bahal Date. 08/02/2024 PRAKASH SATGHAE Consulting Enginee Note: LS No.NLI 2590 1. The scope of work is to complete Reg1stered Real Estate Project as per drawings approved from time to time and as per spec1fications mentioned in agreemernt of sale (")Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor,whose certificate of quantity calculated can be relied upon by the engineer. Incase of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked(") and in case quantity are being calculated by office of Engineer, the name of the