PBX No. 2531431 Nagpur lmprovement Trust 2531432 APPENDIX 'D-1' Form for Sanction of Building Permission &Commencement Certificate uls 45 of M.R.T.P.Act 202307205 Name of the MIS NUPUR CONSTRUCTIO THROUGH ITS PRO. MONISH BHARAT BAHAL Person Address of PLOT NO 40 DEV NAGAR KHAMALAROAD NAGPUR Applicant B.E (WEST)/ Case No. 255452/ Tracklng No. 202307205/ Date Permit No. : Site of Proposed Work, Plot No. : 77-77A-78 alSTRAR Mouza &Khasra : Hajari Pahad-26/6 Layout Name Jai G.N.s.S. Halari Pahad-26/6 f o r a n t of number 255452 dated 19-JUL-2023 SI, With reference to your application under section 44 of M.R. & T,P, Act 1966 to carry Out sanction of Commencement Certificate Certificate and Building Permission Development Work/ Building Permission, The Commencement sanctioned construct in accordance with the IS granted under section 45 of M.R. & T.P, Act to plan subject to the following conditions: commencement certificate/building permit shall 1. The sanction once accorded through this remain valid for Four years in the aggregate but shall have to be renewed every one year from shall be made before expiry of one year if the the date of its issue. The application for renewal done for three consecutive terms of one Work is not already commenced..Such renewal can be year after which proposals shall have to be submitted to obtain development permission afresh. If application for renewal is made after expiry of the stipulated period during which commencement certificate is valid then The Chairman, NIT may condone the delay for submission of application for renewal by charging necessary fees. But in any case commencement certificate shall not be renewed for a period of more than four years from the that no such renewai shall date of commencement certificate /.development certificate, Providedpermission i.e. work up to be necessary if the work is commenced within:the period of valid of lower basement or stilt as plinth level is completed or where they is noplinth up to upper level the case may be and such permission shall remain valid till the work is completed. However the condition of lease of allotment of plot for completion of construction will overrule this duration of sanction. 2. The land vacated in consequence of the enforcement of the setback rule shall form part of the public street. 3. This permission does not entitle you to develop the land which does not vest in you. 4. This building shall be used for the purpose for which the sanction is accorded and as prescribed in the prevailing Development Control Rules and Building By-laws. 5. No departure from the sanctioned plan should be made without obtaining previous sanction of the NIT.If any construction is carried out in contravention of the sanctioned plan the NIT may require it to be demolished or altered in such a manner as it may deem fit. 6. Within onc year from the date of issue of building permit the owner shall commence the work for which the building permit is issued. 7. The initmation regarding completion of construction upto plinth level should be given in the Form as in Apendix "F" of U.D.C.P.R. to the NIT. 8. The Building or part thereof shall not be occupied or used unless occupation certificate has been obtained from Chairman, NIT in prescribed Appendix "H" of U.D.C.P.R.. The owner through his licenced surveyor/Architect/Engineer who has supervised the construction, shall furnish a building completion certificate to the Chairman, NIT in the form in Appendix "G" of U.D.C.P.R..This certificate shall be accompanied by 3 sets of plans of completed development.The Chairman, NIT after inspection of the work and after satisfying himself that there is no deviation from the sanctioned plans, issue an occupancy certificate. 9. Any person who contravences any of the provisions of these regulations, any requirements or obligations imposed on him by virtue of these regulations including the maintenance of fire protection services and applicances and lifts in working order or who interferes with or obstructs any person the discharge of his duties shall be guilty of an offence shall be liable for prosecution. 10. W.C, Bath &washing places shall conform to requirement contained in U.D.C.P.R. 11. Rain water shall entirely be excluded from the connecting sewer & separate arrangement for diverting ran water to road side storm drain shall be made. If any deviation are detected in this respect the Chairman's order for rectifying them shall becomplied with. lk. All drainage work shall be got done through licensed plumber approved by Nagpur ImprOVement Trust o Nagpur Municipal Corporation. T3. W.G., Bathroom and washing places shall not be used unless proper connections are made Cnapter 12 of U.D.C.P.R. through licensed plumber as mentioned in 12 above and cómpletion Notice in forn Gduly signed by licensed surveyor/ArchiteciEngineer ls given and permission to use themis obtained trom Cnaiman, NIT. 14. During the course of construction of building, the sanctioned plan shallalways be avallaole at site for inspection by officials of Nagpur Improvement Trust.The Developer shall install Display Board on conspicuous place as per the clause no.2.8.3 of U.D.C.P.R. 15. Except as aforesaid the permission is aranted subiect to comoliance of Building Regulation for time being in Torce and nothing herein contained shall be regarded as dispensing with such compliance except to the extent expressly specified therein. 16. This permission shall not be construed as affecting in any way the right of Government or Nagpur Improvement Trust or the Municipal Corporation or any other authority or any private person or firm to the land upon with. which permission has been sought to construct building or to any easementary rights connected there he permit holder is not allowed to collect earth/materials from or through Nagpur Improvement Trust land and road sides without permission in writing from Chairman who may arant it on such terms and conditions as may deem fit. Where such permisslon has been aranted such use shall not be an obstruction or be a hinderance to the road user. The excavated material/debris deposited shall be removed within three days oT use of land.If any material is stacked or dumped on Nagpur Improvement Trust land without Trusts prior permission and if such permission is granted but subsequently if it is seen that permission is causing hardsnip to the public then itshall be removed by the Nagpur Improvement Trust at the risk and Nagpur Improvement Trust shall not be responsible for any loss or and cost of this permit holder claim on this account shall be tenable against Nagpur damage cause to the permit holder. No Improvement Trust. 18. Subject to the condition that the party will plant and arow in vacant provisions of Maharashtra (Urban Area) Reservations of Tree Act. 1975. land 13 Nos. of shady trees under the 19. This sanction is subject to the condition that drinking Nagpur Municipal Corporation/Nagpur Improvement Trust. water and sewerage disposal is not guaranteed by 20. Dustbins of suitable sizes should be provided within the plot boundary easily accessible from road. 21. Suitable letter delivery boxes should be installed at easily accessible place on ground floor. 22. Neccessary arrangement for rain water harvesting shall be done 23. Keeping Safe Horizontal & Vertical distances from No. 3A of U.D.C.P.R. and as per Clause 80 of Indian H.T/L.T Lines for Proposed Construction as per Table Electricity Rules 1956 24. This permission is subjected to the conditions mentioned in Regularization Letter, Release Letter, Development Agreement, NOC of Chief Fire Officer, NOC of Airport Authority, court Orders etc. whichever is applicable. 25. The Landowner/Developer and done in contravention to this sanction/ArchitecUEngineer/Structural Engineer shall be held guilty if UDCPR Rule & MRTP Act 1966 as and when embedded. Construction 26. If any error/mistake 'is found in the computation sheet or with DC rules.The"part of the building or calculations in the plan which are not inconfirmity construction which is not as per rules shall be construed as unauthorised and the decision of The Chairman, NIT in this regard shall be final. 27. If any defects is found in ownership-& other documents documents are found to be fraudulent and misleading then submitted for sanction of building construction or if cancelled. Similarly the permit holder shall be liable for criminaltheprosecution permission granted shall be treated as under the provisions of Indian Penal Code. 28. The building Construction shall. be completed under the per the sanctioned building plan, for the breach of any termssupervision of Licensed Civil Engineer/Architect as and conditions, the Building Permission shall be treated as cancelled. 29. Subject to condition mentioned in the Indemnity Bond submitted by the applicant regarding Structral Stability. 30. The Provisions of the Unified Development Control and Promotion Regulations for Nagpur Improvement Trust, Nagpur shall be binding the Owner/Developer. RAF Enclosure: One Copy / One Setae ntmPl: (A.P. Badge ) 202307205 Date of Generation: 25/01/2024 Bylding Engineer (W) Copy to: NSgpurmprovement Trust, Nagpur 1. The Divisional Officer, West Division Ambazari Nagpur, Nagpur Improvement Trust for information with a copy of sanction plan (enclosed herewith) for record -Sd (A.P. Badge ) Building Engineer (W) Nagpur Improvement Trust, Nagpur