N. B. IJhNDE Project Engineer (DCE) Civil Construction Mob No. 9764465443 Layout Development Address :- 59, Kharbi Road, NIaa Bhawani Nagar,Wathoda, Building Works Nagpur-440034. Annexure B FORM 2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal ot Money from Designated Account-Project Wise) Date i 1510712025 To, KIRTISAGAR REALTY PRIVATE LIMITED Nagpur, MAHARASHTRA,44001 5. Subject : Certificate of Cost lncurred for Development of MAULI TOWN- 21 having MahaRERA Registration Number P50500055129 (Only Applicable after project Registration) being developed by KIRTISAGAR REALTY PRIVATE LIMITED. Sir, l^^/e N B LANDE have of Certifying Estimated Cost for MAULI TOWN- 21 having MahaRERA Registration Number P50500055129 (Only Applicable after project Registration, being developed by KIRTISAGAR REALTY PRIVATE LIMITED. 2.We have Estimated the cost of Civil, MEP and allied works required for completion of lhe apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreements of sale. Our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer / Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor' appointed by Developeri Engineer, the assumption ofthe cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain / conflrm the above analysis given to us. 3. We estimate Total estimated the Cost of completion of thc aforesaid prolect under reference at Rs. 317671400.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to thc Civil, MEp and Allied works required for completion of the apartments and proportionate completion of internal & external works,as per specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certificate / completion certificate for the Building(s) /vving(s)/ Layout /Plotted Development from the NAGPUR - METROPOLITAN REGION DEVELOPMENT AUTHORITY being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4.The Estimated Cost incurred till date is calculated at Rs. 149305558.00 (Total of Table A and B).The amount of Estimated Cost incurred is calculated on the basis of input materials/services used and unit cost of these items. 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate Complition of internal & external works, as per specification mentioned in agreement of sale, of the Project is estimated at Rs 168365842.00 (Totat of Tabte A and B) 6' I certify that the Cost of the Civil, I\IEP and allied works the for the apartments and proportionate ate internal & external works,as per specification mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: Table-A Building/ Wing ilayout Plotted Development bearing Number :/ Sr, No. , ,,Palticu'tats Amouht (lh Rs,) 1 Total Estimated Cost of the BuildingMing/Layout 0 Plotted Development as on date of Registration is 2 0 Cost incurred as on date of certificate 3 Work done in Percentage (as Percentage of the estimated cost) 0 4 Balance Cost to be lncurred**(Based on Estimated Cost) 0 5 Cost lncurred on the Additional/Extra items not included in the 0 Estimated Cost (Table-C) Table B lnterna! and External Development Works in respect of the Registered Phase Sr. No. Particulars Amount (ln Rs.) (1) 1 Total Estimated Cost of the BuildingMing/Layout 317671400.00 Plotted Development as on date of Registration is 2 Cost incurred as on date of certificate 149305558.00 3 Work done in Percentage (as percentage of the estimated cost) 47.00 4 Balance Cost to be lncurred**(Based on Estimated Cost) 168365842.00 5 Cost lncurred on the Additional/Extra items not included in the Estimated Cost (Tablc -C) Yours Faithfully t Enr N B LANDE Signature & Name (lN BLOCK LETTERS) with Stamp of Engineer [Not Less than bachelor's Degree Holder or equivalent as per Scction 2(u) of thc Act] LocalAuthority license no. NA (if applicable) Date of Certificate :1510712025 Agreed by: Signatu Name: KIRTISAGAR REALTY PRIVATE LIMITED Date:1510712025 1.The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2.(*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor,whose certificate of ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer,the name of the person in the office of Engineer, who is responsibte for the quantity calculated should be mentioned at the place marked (*). 3.("*) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4.All components of work with specifications are indicative and not exhaustive 5.Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. TABLE C List of Extra/Additional/Deleted ltems considered in Cost. (which were not part of the original Estimate of Total Cost)