PAWAN RAVIPRASAD GUPTA CONSULTING CIVIL ENGINEER PLANNERS, BUILDERS AND DEVELOPERS LIC. NO. N.I.T. 1969, N.M.C. 380 N.M.R.D.A.-39 OFF. : - SHOP NO.115 SECOND FLOOR SHRI SHYAM TOWER SADAR,NAGPUR-440001. M- 99234329 FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 17/10/2024 To, M/S. KIRTISAGAR REALTY Prince castle, Plot No. 105, 1St & 2nd Floor, Gajanan Nagar, Opp, Madhav Netralay Wardha Raod, Nagpur- 440015. Subject: Certificate of Percentage of Completion of Construction Work of MAULI TOWN-21 having Situated at Mouza- Mohgaon, Survey No. 40/1/2 (PART), 41(PART), 42/2, 42/3, 51/1 (PART), 52/2, 53/1 (PART), 54 (PART), Ph No.42 A, Taluka – Nagpur (Gramin), Distinct – Nagpur for the period July-2024 to September-2024 having Maha RERA Registration Number P50500055129 (Only Applicable after project registration) being developed by M/S. KIRTISAGAR REALTY. Sir, I/ We Mr. Pawan Gupta, have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of MAULI TOWN-21 having Situated at Mouza- Mohgaon, Survey No. 40/1/2 (PART), 41(PART), 42/2, 42/3, 51/1 (PART), 52/2, 53/1 (PART), 54 (PART), Ph No.42 A, Taluka – Nagpur (Gramin), Distinct – Nagpur Maha RERA Registration Number P50500055129 (Only Applicable after project registration) PAWAN RAVIPRASAD GUPTA CONSULTING CIVIL ENGINEER PLANNERS, BUILDERS AND DEVELOPERS LIC. NO. N.I.T. 1969, N.M.C. 380 N.M.R.D.A.-39 OFF. : - SHOP NO.115 SECOND FLOOR SHRI SHYAM TOWER SADAR,NAGPUR-440001. M- 99234329 being developed by M/S. KIRTISAGAR REALTY. Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this certificate the Percentage of Work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE - A Layout / Building/ Wing Number _____ (to be prepared separately for each Layout / Building / Wing of the Project) Sr Task / Activity Percentage of Actual No. (2) Work Done (As on (1) date of the Certificate) (3) 1. Excavation NA 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth NA 5. Stilt Floor NA 6. Slabs of Super Structure 7. Internal walls, Internal Plaster, Floorings, Doors and Windows NA within Flats/Premises 8. Sanitary Fittings within the Flat/Premises NA PAWAN RAVIPRASAD GUPTA CONSULTING CIVIL ENGINEER PLANNERS, BUILDERS AND DEVELOPERS LIC. NO. N.I.T. 1969, N.M.C. 380 N.M.R.D.A.-39 OFF. : - SHOP NO.115 SECOND FLOOR SHRI SHYAM TOWER SADAR,NAGPUR-440001. M- 99234329 9. Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and NA Underground Water Tanks 10. External plumbing and external plaster, elevation, completion of NA terraces with waterproofing of the Building/Wing. 11. Installation of lifts, water pumps, Fire Fighting Fittings And NA Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building / Wing, Compound Wall and all other requirements as maybe required to complete project as per specifications in agreement of Sale. Any other activities. Table B Common Areas (Internal and External Development Works) in respect to the Registered Phase / Project Number Common areas Proposed Percentage of Details Sr. No Work done (1) and Facilities. (Yes/No) (5) (2) (3) (As on date of the Certificate) (4) Internal Roads & YES 90 % Work in Progress 1. Footpaths 2. Water Supply Work in Progress YES 90 % Sewerage (chamber, lines, STP) Work in Progress YES 80 % 3. PAWAN RAVIPRASAD GUPTA CONSULTING CIVIL ENGINEER PLANNERS, BUILDERS AND DEVELOPERS LIC. NO. N.I.T. 1969, N.M.C. 380 N.M.R.D.A.-39 OFF. : - SHOP NO.115 SECOND FLOOR SHRI SHYAM TOWER SADAR,NAGPUR-440001. M- 99234329 Storm Water Drains YES 90 % Work in Progress 4. Landscaping &Tree Planting YES 10 % Work in Progress 5. Street Lighting YES 40 % Work in Progress 6. 7. Community Buildings NA NA NA 8. Treatment and disposal of sewage Work in Progress YES 5 % and sullage water 9. Solid Waste management & NA NA NA Disposal Water conservation, Rain water 10. YES 95 % Work in Progress harvesting 11. Energy management NA NA NA Fire protection NA NA NA 12. And fire safety requirements Electrical meter room, sub-station, NA NA NA 13. receiving station 14. Compound wall to open space YES 95 % Work in Progress