PAWAN RAVIPRASAD GUPTA CONSULTING CIVIL ENGINEER PLANNIRS, BUILDERS AND DEVELOPERS Lrc. No. N.r.T. 1969, N.M.C. S8O N.M.R..D.rt.-39 OFF. : - SHOP NO.115 SECOND FLOOR SHRI SHYAM TOWER SADAR, NAGPUR-440001. M- 99234329 FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 13/01 /2025 To, M/S. KIRTISAGAR REALTY PRIVATE LIMITED Prince castle, Plot No. L05, 1St & 2nd Floor, Gajanan Nagar, Opp, Madhav Netralay Wardha Raod, Nagpur- 4400L5. Subiect: Certificate of Percentage of Completion of Construction Work of MAULI TOWN-21 having Situated at Mouza- Mohgaon, Survey No. 40i1l2 (PART), 4l(PART), 42t2,4213,5111 (PART), 52lz,lgtL (PART), b4 GART), Ph No.42 A, Taluka - Nagpur (Gramin), Distinct - Nagpur for the period October-2024 to December-z0z{ having Maha RERA Registration Number P50500055129 [Only Applicable after project registration) being developed by M/S. KIRTISAGAR REATTY PRIVATE LIMITED. Sir, l/ We Mr. Pawan Gupta. have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of MAULI TOWN-21 having Situated at Mouza' Mohgaon, Survey No. 40/1/2 (PART), 41eART), 4212,4213,5U1 (PART), 52t2,53fi (PART), 54 GART), Ph No.42 A, Taluka - Nagpur (Gramin), Distinct - Nagpur Maha RERA Registration Number P50500055129 [0nly Applicable after project registration) being developed by M/S. KIRTISAGAR REALTY PRIVATE LIMITED. (N,q' Qawan cfoviprasat guPU B.E.(ClVlL) iii,i'rHen's, eurLDERs AND DEVELOPERS L..-r'io.rl.r.r.rmg' N.M.R'D'A' 39, N'M'C' 380 ott.: ShoD No. 1 15 Second FlooI' dnri". Sr,v.t ro*.r, Sarlar, Mgpur'44000'l Efiail lD: pawan-I-guila@yahoo'co'ln MOB. I'1o.9923432949 PAWAN RAVIPRASAD GUPTA CONSULTINE CIVIL ENGINEER PLTqNNERS, BUILDERS AND DEVELOPERS Lrc. No. N.r.T. 1969, N.M.C. S80 N.M.R.D.A.-39 OFF. :- SHOP NO.115 SECOND FLOOR SHRI SHYAM TOWER SADAR, NAGPUR-440001. M- 99234329 Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certiflrthat as on date of this certificate the Percentage of Work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE - A Layout / Building/ Wing Number (to be prepared separately for each Layout / Building / Wing of the Project) - Sr Task / Activity Percentage ofActual No. (2) Work Done (As on (1) date ofthe Certificate) t3) 1. Excavation NA 2. Basements (if any) NA 3. Podiums (if anyJ NA 4 Plinth NA 5 Stilt FIoor NA 6. Slabs of Super Structure 7 Internal walls, Internal Plaster, Floorings, Doors and Windows NA within Flas/Premises B. Sanitary Fittings within the Flat/Premises NA 9 Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and NA Underground Water Tanks 10. External plumbing and external plaster, elevation, completion of NA terraces with waterproofing of the Building/Wing. (PawanfuviPrasad QuPu CS,h B.E.(CrVrL) puqilNEns, zutloERs AND DEvELoPERS Lic. N0.N.1.T.1969, N.M'B'D.A. 39' N.M.C. 380 Ofl.: Shop No. 115 Second Floor' Shriram ihyam Torver, Sadar, l'lagprr'4t10001 E+nail lD: pawan-r-gupta0yahoo.co in iIOB. N0.9923432949 PAWAN RAVIPRASAD GUPTA CONSULTING CIUL ENGINEER PLANNERS, BUILDERS AND DEVELOPERS Lrc. No. N.r.T. 1969, N.M.C. 380 N.M.R.D.A.-$9 OFF. :- SHOP NO.115 SECOND FLOOR SHRI SHYAM TOWER SADAR, NAGPUR-440001. M- 99234329 11. Installation of lifts, water pumps, Fire Fighting Fittings And NA Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building / Wing, Compound Wall and all other requirements as maybe required to complete project as per specifications in agreement of Sale. Any other activities. Table B Common Areas (Internal and External Development Works) in respect to the Registered Phase / Project Number Common areas Proposed Percentage of Details Sr. No Work done (1) and Facilities. (Yes/No) (s) (2) (3) [As on date of the Certificate) (4) Internal Roads & YES 97 o/o Work in Progress L. Footpaths 2. Water Supply Work in Progress YES 95 o/o Sewerage (chamber, lines, STP) Work in Progress YES 90 o/o 3. Storm Water Drains YES 95 o/o Work in Progress 4. Landscaping & Tree Planting YES 20 o/o Work in Progress 5 Street Lighting YES 50 o/o Work in Progress 6. 7 Community Buildings NA NA NA B. Treatment and disposal of sewage Work in Progress YES 1,0 o/o and sullage water 9. Solid Waste management & NA NA NA Disposal ft*q' { ggq#,SQsviPrasalguPta 4 PLANNERS, BUII,DERS At'lD DEVELOPERS ? Lic. t10.N.1.T.1969, N.M.R.DA 39, N.M.C. 380 0ll.: Strop No. 115 Second Floor, Shriram Shyam Tower, Sadar, t.lagprr-440ml. + o E-mail lD: pavvan_r_gupta@yahoo.co.in MoB. No.9923432949 PAWAN RAVIPRASAD GUPTA CONSULTIT{G CIVIL ENEINEER PLA NNERS, B UILDERS IL.ND DEVELOPERS Lrc. No. N.r.T. 1969, N.M.C. 38O N.M.R.D..&.-39 OFF. : - SHOP NO.115 SECOND FLOOR SHRI SHYAM TOWER SADAR, NAGPUR-440001. M- 99234329 Water conservation, Rain water 10. harvesting YES 97 o/o Work in Progress 11. Energy management NA NA NA Fire protection NA NA NA 12. And fire safety requirements Electrical meter room, sub-station, NA NA NA 13. receiving station 74. Compound wall to open space YES 98 o/o Work in Progress CSrAr Q_qyanfun'iprasad gupu B.E.(CrVlL) PI.ANNERS, BUII.DERS AND DEVELOPEBS Lic. tlo.N.l.T.I969, N.M.H.D.A 39, N.M.C.380 Oll.: Shop No. 115 Second Floor, Shriram Shyam Tower, Sadar, 1-lagpur-{40m1. Eflail lD: pawan-r-gupta@yah@.o.in li{OB. t{o.9923432949