PAWAN RAVIPRASAD GUPTA CONSULTING CIVIL gNGINEER PL,q NNERS, BUILDERS A.ND DEVELOPERS LIC. NO. N.r.T. 1969, N,M.C. 380,N.M.R.D..A.-39, OFF. : - SHOP N0.115 SECOND FLOOR SHRI SHYAM TOWER SADAR,NAGPUR-440001. M- 9923432949 FORIYI 1 [see Regulation 3l ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 04l07 12024 To, M/S. KIRTISAGAR REALTY Prince castle, Plot No. L05, 1St & 2nd Floor, Gajanan Nagar, Opp, Madhav Netralay Wardha Raod, Nagpur- 440015. Subiect: Certificate of Percentage of Completion of Construction Work of MAULI TOWN- 2l for the period Aprit-2024 to fune-2024 having Maha RERA Registration Number P50500055L29 [Only Applicable after project registration) being developed by M/S. KIRTISAGAR REALTY Sir, l/ We Mr. Pawan Gupta, have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of MAULI TOWN-21, Situated at Mouza-Mohgaon, Kh No. 5.212, Tah-Nagpur(Rf, Dist- Nagpur having Maha RERA Registration Number P50500055129 being developed by M/S. KIRTISAGAR REALTY lN* i .. ri ii 'fuwiprasad Qupt,r 3.E. 13tVlL) PIANNERS, BI'II,.OEBS AM) DEVELOPEBS Lic. No.N.l.T.1969,N.M.R.D.A 39, N,M.C,38Q ofl.: Shop t{o.I I5 Seoond Focr, Srlriram Shyar Tocr, Sdat l,lagpur-440001 E.T?i' r') pawan_(ilDta Oyalm.o.in lr'-u N09923432949. Based on Site Inspection, with respectto Layout / each of the Building/Wing of the aforesaid Real Estate Project I certiffthat as on date of this certificate the Percentage of Work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE - A Layout / Building/ Wing Number _ fto be prepared separately for each Layout / Building / Wing of the Project) Sr Task / Activity Percentage ofActual No. (2) Work Done (As on (1) date ofthe Certificate) t3) 1. Excavation NA 2. Basements (if any) NA 3 Podiums fif any) NA 4. Plinth NA 5. Stilt Floor NA 6. Slabs of Super Structure 7 Internal walls, Internal Plaster, Floorings, Doors and Windows NA within Flats/Premises B. Sanitary Fittings within the Flat/Premises NA 9 Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and NA Underground Water Tanks 10. External plumbing and external plaster, elevation, completion of NA terraces with waterproofing of the Building/Wing. 1L. Installation of lifts, waterpumps, Fire Fighting Fittings And NA Equipment as per CF0 NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building /Wing, Compound Wall and all other requirements as maybe required to complete project as per specifications in agreement of Sale. Any other activities. N$' ,. , , ,ut 'ligtuiPrasat QuPt,t a E (ClvlL) PLANNERS, EI'II..OEFS ATO DE\GLOPERS Lic. No.N.l.T.1g00,N'lt'R'D'A. 39' N'M'C'380 Ofl .: Srpp t{ot t5 Sryd Foot, Slrrram Stryan Tqs, Sd i$CFtr'l{SJo I t .'..r' ^ para-r-SfE Cydr.co in tr'1;: f l:']9?34329t19. Table B Common Areas (Internal and External Development Works) in respect to the Registered Phase / Project Number Sr. No Common areas Proposed Percentage of Details (1) and Facilities. (Yes/No) Work done (s) (2) (3) (As on date of the Certificate) (4) Internal Roads & YES 1. 5% Work in Progress Footpaths 2. Water Supply Work in Progress YES 5 o/o Sewerage (chamber, lines, STPJ 3 YES B0 o/o Work in Progress Storm Water Drains 4 YES 90 o/o Work in Progress Landscaping &Tree Planting 5. YES 2 o/o Work in Progress Street Lighting Work in Progress 6. YES 1, o/o Community Buildings NA NA NA B. Treatment and disposal of sewage YES 0 o/o Work in Progress and sullage water 9 Solid Waste management & NA NA NA Disposal Water conservation, Rain water 10. harvesting YES 95 o/o Work in Progress 11. Energy management NA NA NA Fire protection NA NA NA 12 And fire safety requirements Electrical meter room, sub-station, NA NA NA 13 receiving station L4, Compound wall to open space YES 67 o/o Work in Progress Lt t s#v t'fuLuipraso[ $ u 1, t, B E. (CIVIL} PL^NNERS, BUILDERS AND DEVELOPERS Lic. No.N.l.T.l969,N'M.R.D.A. 39, N M C'380 0ll.: Shop l,lo.l tS Secorxl Fbor, Sl'rrram ShyamTotYer, Sa&I Nagpur'440001 5'', "r p3er3n-r-grpta @yalpo.co.in 1.';, . flr 3923d9949.