FORM I [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 3011212023 To, 1I[/S. ASHOK VATIKA, House No. 866, Jagnatha Budhwari, Pachpaoli Road, KumbharPura, Nagpur- 440017. Subject: Certificate of Percentage of Completion of Construction Work of "ASHOK VATIKA - KANIAN" having MahaRERA Registration Number (Only applicable after Project Registration) being Developed by lflS'ASHOK VATIKA. Sir, I/We ALOK LUNIA have undertaken assignment as Architect/Licensed Surveyor of Certifying Percentage of Completion of Construction Work of "ASHOK VATIKA - KANAN" having MahaRERA Registration Number (Only applicable after Project Registration) being Developed by IWS. ASHOK VATIKA. Based on the Site Inspection, with respect to the each Building of the aforesaid Real Estate project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building of the Real Estate Project under MahaRSRA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. -o-t< l-unla 14, Pendse LaY'out, Chatra Plti t\'1''r l1 a r, Re.i, l'{o: CA, !9; iil AR. ALOK LUNIA (License No.CAl199 9 / 25349) 7 TABLE. A Building -ASHOK VATIKA - KANAI\ (to be prepared separately for each BuildingAMing of Project) Sr. Tasks / Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) (2t (3) 1 Excavation 0% 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth 0% 5. stilt Floor 0% 6. Slab of Super Structure 0% 7. Internal Walls, Internal Plaster, Floorings, Doors, windows 0o/o within Flats / Premises 8. Sanitary Fittings within Flats / Premises UYo 9. Shircases, Lift Wells & Lobbies at each Floor Level Overhead 0% and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion 0% of Terraces, with waterproofing of the Building / Wtqg ll Installation of Lifts, Water Pumps, Fire Fighting Fittings and 0% Equipments as per CFO NOC, Electrical Fittings, Mechanical - Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity iAlot Lunia 14, Pendse LaY"out, Chatrapati Nagar, Reil. No: CAl99l2S34g AR. ALOK LUNIA (License No.CA/ 199 9 / 7,53 49) TABLE.B Common Areas (Internal & External Development Works) in respect of the Registered Phase / Project Number Sr. Common Areas & Facilities Proposed Percentage of Details No. (Yes / No) Work Done (As on date of Certificate) (1) a) (3) (4) (s) I Internal Roads & Footpaths No N.A. N.A. 2. Water Supply Yes 0% As per Sanction 3. Sewerage (Chamber, Lines, Septic Yes 0% AS per Sanction Tank, STP) 4. Strom Water Drains No N.A. N.A. 5. Landscaping & Tree Planting Yes 0% AS per Sanction 6. Street Lighting No N.A. N.A. 7. Community Buildings No N.A. N.A. 8. Treatment & Disposal of Sewage and No N.A. N.A. lgllqge Water 9. Solid Waste Management & Disposal No N.A. N.A. 10. Water Conservation/ Rain Water Yes 0% As per sanction Harvesting 11. Energy Management No N.A. N.A. 12. Fire Protection &, Fire Safety No N.A. N.A. requirements 13. Electrical Meter Room, Sub-Station, Yes 0% As per Sanctioned Receiving Station bv MSEB 14. Others (Option to Add more) No N.A. N.A. 15 Retaining Wall No NA NA Ar. Alok Lunia 14, Pendse Layout, Chatrapati Nagar, Reg. No: CA199125349 AR. ALOK LUNIA (License No.CAl199 I /25349) Asretol I *cef |d g"b :- 0L- ol' 2oz3 g^l : Plo..1. Nt6e,,,. g"rr*"r B}"o7o4 ko't C Pr"o,^"ltl)