ENGG. NA VIN TIKHE Office Add- 1st Floor, Rohera Business Arcade, Ajnl Sgr, Wardha Road, Nagpur, Pin: 440015 -------------------------------------------------------------------------------------------------------------------------- Annexure B FORM 2 [see Regulation 3) ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project Wise) Date: 15/04/26 To, YASH INFRAVENTURES Nagpur, MAHARASHTRA,440015 Subject: Certificate of Cost Incurred for Development of Anjaneya Crest having MahaRERA Registration Number P50500055105 (Only Applicable after project Registartion) being developed by YASH INFRAVENTURES Sir, I/We NAVIN TIKHE have of Certifying Estimated Cost for Anjaneya Crest having MahaRERA Registration Number P50500055105 (Only Applicable after project Registration, being developed by YASH INFRAVENTURES) 2.We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreements of sale. Our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer I Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor· appointed by Developer/Engineer, the assumption ofthe cost of material.labour and other inputs made by developer.and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total estimated the Cost of completion of the aforesaid project under reference at Rs. 230000000.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to the Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works.as per specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certificate I completion certificate for the Building(s) /Wing(s)/ Layout /Plotted Development from the Nagpur Municipal Corporation being the Planning Authority under whose jurisidiction the aforesaid project is being implemented. 4.The Estimated Cost incured till date is calculated at Rs. 190500000.00 (Total of Table A and B).The amount of Estimated Cost incurred is calculated on the basis of input materials/services used and unit cost of these items. 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate Complition of internal & external works, as per specification mentioned in agreement of sale, of the Page 1 of 4 Table B Internal and External Oovolopmont Works In rospoct of tho Roglstorod Phoso Sr. No. Portloulors Amount (In Rs.) (1 \ 1 Total Estimated Cost ol tho Bulldln%/Wlng/Layout 0 Plotted Dovelooment as on dato of oalstratlon Is 2 Cost Incurred os on date of cortlllcato 0 3 Work done in Percentaoe las oorcontaao ol tho osthnatod cost\ 0 4 Balance Cost to be lncurred"/Based on Estimated Cost\ 0 5 Cost Incurred on the Additional/Extra Items not Included In the Estimated Cost (Table -C\ Yours Faithfully �E Signature & Name (IN BLOCK LETTERS) with Stamp of Engineer [Not Less than bachelor's Degree Holder or equivalent as per Section 2(u) of the Act] Local Authority license no. 1 HGSVQ06UT (if applicable) Date of Certificate: Agreed and Accepted by: �- Signature of Promoter Name:YASHINFRAVENTURE Date: 15/04/26 1.The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2.(·) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor.whose certificate of In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked n and in case quantity are being calculated by office of Engineer.the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3.(·*) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required/ escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred/ to be incurred. 4.AII components of work with specifications are indicative and not exhaustive 5.Please specify if there are any deviations/ qualifications. Example: Any deviations in Input material used from specifications in agreement of sale. Page 3 of 4