Nagpur Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Building Permit No - 216385 Permit No. : NMO/B/2023/APL/02260 Proposal Code : NMO-23-84367 Date : 18/01/2024 Basement floor,Ground Floor,First Floor,Second Floor,third Floor,Fourth Floor,Fifth Yash Building Name : Floors : to Seventh nineth to eleventh fourteenth and fifteenth floor ,Eight floor,Twelveth Infraventures(Residential) Floor,Thirteenth Floor To, i)Vivek Trimbak Kunawar, Prafulla Dattatraya Godse, Suvarna Prafulla Godse, Rajendra Baburao Chakor, Damodhar Parsasram Katulwar, Sujata Vidyadhar Khaparde, Sandip Namdevrao Wadibhasme, Prashant Baburao Chakor, Archita Vivek Shastri, Swaroop Vivek Shastri, Through Poa Holder Yash Infraventures Partner Mr V, Mr Vijay Tilochand Borundiya, PLOT NO. 31, MOUZA – NO. 10, AJNI, WARD NO. 05, KHASRA NO. 104/1, TAH. & DIST. NAGPUR ii) Hemant Mandwwekar (Architect) Sir/Madam, With reference to your application No NMO202301496, dated 05-10-2023 for the grant of sanction of Commencement Certificate under Section 18/44 of The Maharashtra Regional and Town Planning Act, 1966 read with Maharashtra Municipal Corporations Act, 1949 , to carry out development work / Building on Plot No 31, City Survey No./Survey No./Revenue S.No./Khasra No./Gut No. 2047, Final Plot No. 31, Sector No. , Mouje Ajni situated at Road / Street 12.0, Society . The Commencement Certificate / Building Permit is granted under Section 18/45 of the said Act, subject to the following conditions : 1. The land vacated in consequence of the enforcement of the set back line shall form part of the public street. 2. No new building or part thereof shall be occupied or allowed to be occupied or permitted to be used by any person until Occupancy permission has been granted. 3. The Development permission/Commencement Certificate shall remain valid for a period of one year commencing from the date of its issue. 4. This permission does not entitle you to develop the land which does not vest in you. 5. This permission is being issued as per the provisions of UDCPR. If any permission is required to be obtained from any department of the state or central government under the provisions of any other laws / rules , it shall be binding on the owner/ developer to obtain such permission from the concerned authority. 6. Information Board to be displayed at site till Occupation Certificate. 7. If in the development permission reserved land/amenity space/road widening land is to be handed over to the authority in the lieu of DEVELOPMENT RIGHTS if any, then necessary possession receipt, registered transfer deed alongwith change in name on record of rights shall be executed in the name of authority with in 6 month from the commencement certificate. 8. All the provision mentioned in UDCPR,as may be applicable, shall be binding on the owner/developer. 9. Provision for recycling of Gray water ,where ever applicable shall be completed prior to completion certificate and design, drawing with completion certificate shall be submitted along with the application for occupancy certificate. 10. Lift Certificate from PWD should be submitted before Occupation Certificate, if applicable. 11. Permission for cutting of tree, if necessary, shall be obtained from the tree authority. Also the certificate/letter for plantation of trees on the land, if required under the provision of tree act, shall be submitted before occupation certificate. 12. All guidelines mentioned in the environment and forest climate change department, Govt. of Maharashtra, letter no CAP-2023/CR-170,TC-2, shall be followed, if applicable 13. Copies of agreements executed with occupants should be deposited prior to commencement of work. 1/2 Nagpur Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Building Permit No - 216385 Permit No. : NMO/B/2023/APL/02260 Proposal Code : NMO-23-84367 Date : 18/01/2024 14. Authority will not supply water for construction. 15. Areas/cities where storm water drainage system exists or designed, design and drawings from Service consultant for storm water drainage should be submitted to the concerned department of the authority before Commencement of the work and completion certificate of the consultant in this regard shall be submitted along with the application for occupancy certificate. 16. The owner/developer shall submit the completion certificate from the service consultant for completion of the septic tank or proper connection to the sewerage system of the authority or sewage treatment plant (where ever necessary) Signature Not Verified Digitally signed by PRAMOD BHAURAO GAWANDE Date: 2024.01.18 19:07:50 IST Reason: Approved Certificate Location: Nagpur Municipal Corporation Project Code : NMO-23-84367 Application Number : NMO202301496 Proposal Number : 216385 Certificate Number : NMO/B/2023/APL/02260 Deputy Director Of Town Planning, Nagpur Municipal Corporation, Scan QR code for verification of authenticity. 2/2