B.R.PIPARHETE Consulting Architect & Civil Engineer. A WING 202, RAJAT SANKUL NEAR GANESHPETH BUS STOP NAGPUR- 440012. E-mail:-bhushanpip2023@gmail.comFORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 30/06/2025 To, MOHINI PARK (Prop : Bhikulal J bajaj) Subject: Certificate of Percentage of Completion of Construction Work of the entire ProjecthavingMahaRERA Registration Number Situated on the land bearing Survey No 145/3, Panjri (BU), Tah Nagpur (Gramin), Nagpur being developed by Mohini Park. Sir, I/ WeB. R. Piparhete have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of the entire Projecthaving MahaRERA Registration Number P50500054584 being developed by Mohini Park. Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this certificate the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B TABLE - A Layout / Building/ Wing Number _____ (to be prepared separately for each Layout / Building / Wing of the Project) Sr Task / Activity Percentage of No. (2) Actual Work Done (1) (As on date of the Certificate) (3) 1. Excavation 2. Basements (if any) 3. Podiums (if any) 4. Plinth 5. Stilt Floor 6. Slabs of Super Structure 7. Internal walls, Internal Plaster, Floorings, Doors and Windows within Flats/Premises 8. Sanitary Fittings within the Flat/Premises 9. Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and Underground Water Tanks 10. External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing. 11. Installation of lifts, water pumps, Fire Fighting Fittings And Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building / Wing, Compound Wall and all other requirements as maybe required to complete project as per specifications in agreement of Sale. Any other activities. Table B Common Areas (Internal and External Development Works) in respect to the Registered Phase / Project Number Sr.No Common areas Proposed Percentage of Details (1) and Facilities. (Yes/No) Work done (5) (2) (3) (As on date of the Certificate) 1. InternalRoads& Yes (4) 75% Footpaths 2. WaterSupply Yes 85% 3. Sewerage (chamber, lines, Yes 75% SepticTank, STP) 4. Storm Water Drains Yes 75% 5. Landscaping &Tree Planting Yes 00% 6. Street Lighting Yes 00% 7. Community Buildings Yes 00% 8. Treatment and disposal of No 00% sewage and sullage water 9. Solid Waste management & No 00% Disposal 10. Water conservation, Rain Yes 00% water harvesting 11. Energy management Yes 00% 12. Fire protection No 00% And fire safety requirements 13. Electrical meter room, sub- Yes 00% station, receiving station 14. Others (Option to Add more) Bhushan Digitally signed by Bhushan Rajesh Rajesh Piparhete Date: 2025.07.21 Piparhete 17:34:04 +05'30'