DESIGN Annexure A Architecture FORMl Planning & [See Regulation 3] Interiors ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 31/03/2025 To, Mis Atharva Infraventures, Sixth Floor, Flat No. 606, Leela Gardens, Opposite Joggers Park, New Sneh Nagar, Wardha Road, Nagpur -440025. Subject: Certificate of Percentage of Completion of Construction Work of Atharva Sapphire Towers - B having MahaRERA Registration Number "P50500054298" being Developed by Mis. Atharva Infraventures. Sir, I, Lokesh Kadu of Emanate Design have undertaken assignment as architect/ licensed surveyor of Certifying Percentage of Completion of Construction Work of Atharva Sapphire Towers - B, having MahaRERA Registration Number "PS0500054298" being Developed by Mis. Atharva Infraventures. Based on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. CA/2007/39381 NMCR-402, NIT-2140 Block No. 11, llA, 12, 3rd Floor, A-Wing {J.B Wing), Hangalwari Complex, Sadar, Nagpur - 440001 9823872384, 7276384238 emanatedesign9@gmail.com www.emanatedesign.in TABLE-A Layout/ Building I Wing No.Atharva Sapphire Towers - B (to be prepared separately for each Building/ Wing of Project) Percentage of Actual Sr. Work Done Tasks/ Activity No. (As on date of the Certificate) (1) (2) (3) 1. Excavation 100% 2. Basement (if any) 100% 3. Podiums (if any) Nil 4. Plinth 100% 5. Stilt Floor 80% 6. Slab of Super Structure 50% Internal Walls, Internal Plaster, Floorings, Doors, 7. 20% windows within Flats/ Premises 8. Sanitary Fittings within Flats/ Premises 0% Staircases, Lift Wells & Lobbies at each Floor Level 9. 0% Overhead and Underground Water Tanks External Plumbing & External Plaster, Elevation, 10. Completion of Terraces, with waterproofing of the 0% Building/ Wing Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment I CRZ NOC, Finishing to Entrance 11 Lobby/s, Plinth Protection, Paving of Areas appurtenant 0% to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activities. u CA/2007/39381 NMCR-402, NIT-2140 TABLE-B Common Areas (Internal & External Development Works) in respect of the Registered Phase I Project Atharva Sapphire Towers - B Percentage of Sr. Proposed actual Work Done Common Areas & Facilities Details No. (Yes I No) (As on date of Certificate) (1) (2) (3) (4) (5) 1. Internal Roads & Footpaths No 0 NA Borewell 2. Water Supply Yes 0% Corporation Water after OC Sewerage (Chamber, Lines, As per sanction plan 3. Yes 10% Septic Tank, STP) 4. Strom Water Drains Yes 0% As per sanction plan 5. Landscaping & Tree Planting Yes 0% As per sanction plan 6. Street Lighting No 0 NA 7. Community Buildings No 0 NA Treatment & Disposal of Sewage 8. No 0 NA and Sullage Water Solid Waste Management & No 0 NA 9. Disposal Water Conservation/ Rain Water As per sanction plan 10. Yes 0% Harvesting 11. Energy Management No 0 NA Fire Protection & Fire Safety As per sanction plan 12. Yes 0% requirements Electrical Meter Room, Sub- Meter Panel shall be 13. Yes 0% orovided Station, Receiving Station 14. Others (Option to add more) No /J 0 NA r Yours faithfully, CA/2007/39381 NMCR-402, NIT-2140 (Lokesh Kadu of Emanate Design) License Number Agreed & Accepted by: M/s Atharva Infraventures Signature of Partner Name: Pratik Chandrakant Suramwar Date: 31/03/2025