FORM-2A [See Regulation 3A.] ENGINEERS'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at the end of Financial Year) Date: 07/08/2026 To MUKUNDA KESHAVAM REALTORS KESHAVAM 924, NEAR HALDIRAM, DAY 2 DAY DESHPANDE LAYOUT, NAGPUR-440008 Quality Assurance Certificate (Certificate No. ......................for the Year Ending 31/03/2026) Subject : Certificate for quality of materials used and quality of Construction and workmanship of the work of “MUKUNDA KESHAVAM CITY 9” having MahaRERA Registration Number P50500054443 being developed by MUKUNDA KESHAVAM REALTORS Sir, I/We Unmesh Ingle have undertaken an assignment of supervision of this real estate project Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows : 1. Structural Design, Stability and Testing Sr. No. Parameters Yes/No Remarks 1 Whether soil investigations of the site has been No NA conducted before the structural design and soil parameters have been accounted for in the structural design/drawings? 2 Whether Structural Engineer has been appointed for No NA the project? 3 Whether the inspection registers, site order book and Yes All registers (inspection, site order book and quality control test registers are maintained at the site quality control test registers) are being properly and endorsed by the Engineer–in-Charge? maintained at site and are up to date. They are periodically checked and endorsed by the Engineer-in-Charge with signature and date Page 1 of3 Sr. No. Parameters Yes/No Remarks 4 Whether testing facilities to check quality of Yes All material testing is done periodically material is available at site? and reports are submitted to NIT 5 Whether the statuary provisions for disaster No NA resistance/earthquake resistant design have been incorporated, specially in case of multi-storeyed construction? 6 Has suitable cognizance been taken on demarcated No NA flood lines and appropriate precautions taken for protecting the site from flooding considering local flooding issues? 2. Input Materials Sr. No. Parameters Yes/No Remarks 1 Whether the following building materials confirm to Yes Building material confirm to relevant relevant IS/BS/NBC Code, or as per Industry IS/BS/NBC Codes Standards? If yes, provide details: (a) Cement, concrete and coarse aggregate Yes IS 456:2000 (b) Steel and its alloys Yes IS 1786:2008 (c) Electrical wire, fittings and accessories No NA (d) Plumbing and sanitary fittings Yes NBC (2016) Part 9 2 Whether regular tests of materials and construction Yes Standerd Precision Testing Lebrotory, products are being done from accredited labs also? Nagpur If yes, details of such labs 3 Whether manufacturer test certificate for cement, Yes steel, pipes etc. have been obtained and whether supply records are being maintained? 4 Whether suitable water is being used for Yes construction? (i) What is the source of water? Yes Tubewell (ii)Has water been tested and approved by Yes Engineer-in-Charge before construction? (iii)Has water been tested subsequently as per Yes requirement? 3. Quality of Workmanship Sr. No. Parameters Yes/No Remarks 1 Whether works of all the electrical No NA wiring/connections/lift installation/other electrical installations have been carried out under authorized/registered electrical engineer and whether records of the same has been maintained? 2 Whether all related works of plumbing & sanitary Yes including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized/registered plumbers/sanitary contractors and whether records of the same has been maintained? 3 Whether all the work is being carried out under Yes supervision of experienced and skilled professional? Further, whether the workmanship and quality is satisfactory and up to the mark and the work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? Page 2 of3 4 Whether remedial measures are undertaken to No NA prevent dampness and leakages? If yes, provide details 5 Whether safety precautions are undertaken during Yes construction activities for all type of workers? 4. Miscellaneous Sr. No. Parameters Yes/No No 1 Whether third party quality inspection is being No NA carried out on site during/after completion of the works? If yes, provide details. 2 Whether anti-termite treatment has been undertaken No NA for the soil? 3 Whether fire-fighting arrangements has been No NA undertaken under supervision of fire consultant? 4 Whether proper signages have been installed on No NA site/completed building as per requirement? 5 Whether precautions are under taken to avoid air No NA pollution during construction? Please specify. 6 Whether records of all test reports/results have Yes been properly kept in the prescribed formats and whether the same are available at site for viewing by allottees and to be handed over to the association of allottees? 7 Whether all relevant records including sanctioned Yes building plans, utility drawings, various test reports/results have been properly kept in the prescribed formats to be handed over to the association of allottees? 8 Any innovative/cost effective/green technology has No been used for improving quality/energy efficiency? Please specify. Yours Faithfully Signature of Engineer (Site Supervisor) Name: AR. SACHIN WAGHMARE Agreed and accepted by Qualification(Notlessthangraduate) License No. (if any): NMRDA/R/2022/APL/00076\ Signature of Promoter Name: MUKUNDA KESHAVAM REALTORS Date:07/08/2026 Page 3 of3