!!!!! UMESH LAMGE ARCHITECT & INTERIOR DESIGNER 402, DAYA CHAMBER, AJNI SQ., WARDHA ROAD, NAGPUR- 15 Mobile No.- 09822566554, E-mail ID - lamge71 @gmail.com ARCHITECT’S CERTIFICATE Date: 05/04/2025 To , Agrawal Estates House No. 127/2, Kasturi Building, Farmland, Ramdaspeth, Nagpur - 440010 (MH) Subject: Certificate of Percentage of Completion of Construction Work of Agrawal Estates having MahaRE;RA Registration no. P50500054301 being developed by Agrawa1 Estates. Sir, I Architect Umesh M La Inge have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of Agrawal Estates, having MahaRERA Registration no. P50500054301 being developed by Agrawa1 Estates. Based on Site Inspection, with respect to the building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project under MahaliERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B Table A Agrawa1 Estates Sr. Tasks / Activity Percentage No of work done Excavation NA Basements (if any) NA Podiums (if any) NA Plinth NA Stilt Floor NA Slabs of Super StrLm Internal walls, Internal Plaster, Floorings, Doors and Windows within Flat/ Premises Sanitary Fittings within the Flat/ Premises Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and Underground Water Tanks 10 External plumbing and external plaster , elevation , NA completion of terraces with waterproofing of the Building/ Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and NA Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. TABLE-B Common Areas (Internal & External Development Works) in Respect of the entire Registered Phase / Project Number S.No. Common areas and Propos Percentage Details Facilities, Amenities ed of (Yes/ N Actual Work 0) done (As on date of the certificate ) r Yes 92% AS PER SANCTIONED LAYOUT PLAN a Yes 82% AS PER SANCTIONED LAYOUT PLAN 3. Sewerage (chamber, lines, Yes 100% AS PER Septic Tank, STP) SANCTIONED LAYOUT PLAN o Yes 100% AS PER SANCTIONED LAYOUT PLAN a Yes 5% AS PER SANCTIONED LAYOUT PLAN 6 Yes 0% AS PER SANCTIONED LAYOUT PLAN Community Buildings No 0 NA Treatment and disposal of No 0 NA sewage and sullage water o o Disposal 10. Water conservation/ Rain No o ENA water harvesting Energy management Fire protection and fire safety Requirement 13. Electrical meter room, sub- Yes 0% AS PER station, recerving statlon SANCTIONED LAYOUT PLAN r Yes 95% AS PER Open Space SANCTIONED LAYOUT PLAN Yours Faithfully UMESH IGE Architect Umesh M xh. (Hons) RCHITECTS & INTERIOR DESIGNERS Name of Architect & S: 10. CA/95/1 8907 ’C Ltc No.: R-90 NIT Lie No.: 865 J Agreed and accepted by: AGRAWAkESTATES ====„.. Dilip Pralhadrai Agrawa1 Partner and Authorized Signatory Agrawal Estates Date: 05/04/2025