B.R.PIPARHETE EOTsULTINS AREHITEtrT & EIV Iu ENGINEER. STOP ESHPETH BUS A WING 2O2, RAJAT SANKUL NEAR GAN NAGPUR.44OO12, ANNEXURE AFORM-2A ISeeRegulation3A] ASSURANCE ENGINEER'S CERTiFICATE FOR QUALITY (Site SuPervisor's Certificate) (Tobe submitte datendoftheFinanci alYear) Date: lO IOS /2025 To, M/S SHIVLAXMI LAND DEVELOPERS' 97, Ridge Road, Raghuji Nagar, Nagpur - 44OO24 QualitY Assurance Certificate (Certificate n o 1 fortheyearending3l/s l2025l and quality of construction and Subject: certificate for quality of materia-ls usedlocated at Kh no 6414 having LAYOUT workmanship forthe work of sruvenxan MahaRERA Registration Number psoso oos44L7 being developed by SHIVLAXMI LAND DEVELOPERS. Sir, assignment of sr'rpervision of this rea-l estate I/We B.R.PIPARHETE have under taken the project. OurResPonsibilitY' development permission and as per the To carry out the work in accordance with the testing approved. plan, to submit certificate of supervision of work' to carry out material or in an autho rized' laboratory as per prevailing and applicable standards' to in-situ u's per ptt"tiibtd specifications' and as per ensure quality of wort and work manship NeC oth.t relevant code of practice' "ttd7o, The d.etails of the quality areas follows: 1. Structural Design, Stability and Testing Sr. Pararneters Yes No Remarks No. 1 Whether soil investigations of the site has been NA as it is conducted be fore the structural design and soil plotted parameter shave been accounted for in the development of structural design/ drawings? Land 2 Whether Structural Engineer has been appointed Name: NA for theproject? LicenseNo: NA Mobile: NA E-mail: NA 3 Whether the inspection registers, site order book NA as it is and quality control test registers are maintained plotted at the site properly and endorsed by the development of Engineer-in-Charge? Land 4 Whether testing facilities to check quality of NA as it is material is available at site? plotted development of Land 5 Whether the statuary provisions for disaster NA as it is resistance/ earthquake resistant design have been plotted incorporated, especially in case of multistoried development of construction? Land 6. Has suitable cognizance been taken on demarcated NA as it is flood lines and appropriate precautions taken for plotted protecting the site from flooding considering loca-l development of flooding issues? Land 2. InputMaterials Sr Parameters Yes No Remarks No 1 Wh etherthefollowin gbuildin gmaterialsco nfi rmto relevant IS/BS/NBC Code, or as per Industry Standards? Ifyes,providedetails : ( a) Cement, concreteandcoarseaggregate (b)Steelanditsalloys ( c) Electricalwire, fi ttin gsandacces s ories ( d) Plumbingands anitaryfi ttings 2 Whether regular tests of materials and construction products are being done from accredited labs also? If yes, details of such labs a .) Whether manufacturer test certificate for cement, steel, pipes etc. have been obtained and whether supply records are being maintained? 4 Whethersuitablewate risbeingusedforconstruction? (iJ Whatisthesourceofwater? [iiJ Has water been tested and approved by Water Tanker Engineer-in-Charge before construction? [iii) Haswaterbeentestedsubsequentlyasperrequireme nt? 3. QualityofWorkmanship Sr Parameters Yes No Remarks No 1 Whetherworks ofallthe electricalwiring/ connections / lift installation / other electrical installations haveb e encarrie doutunderam thorized I re gis tere delec trical engineer and whether records of the same has been maintained? 2 Whether all related works of plumbing & sanitary including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized /registered plumb ers / sanitarycontractorsandwhetherrecord s of the sarne has been maintained? .) \) Whether all the work is being carried out under supervision of experienced and skilled professional? Further, whether the workmanship and quality is satisfactory and up to the mark and the work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? 4 Whether remedial measures are undertaken to preventdampness and leakages? If yes, provide details 5 Whethers afetSrprecautionsareundertakenduringcon struction activities for all type of workers ? 4. Miscellaneous Sr Parameters Yes No Remarks No 1 Whether third party quality inspection is being carried outon site during/after completion of the works? Ifyes, providedetails. 2 Whetheranti- termitetreatmenthasbeenundertakenfor the soil? - J Whetherfire- fightingarrangementshasbeenundertaken under supervision of fire consultant? 4 Whetherpropersignagehavebeeninstalledons ite / completed building as per requirement? 5 Whether precautions are undertaken to avoid air pollutionduring construction? Please specify. 6 Whether records of all test reports / results have been properly kept in the prescribed formats and whether the same are available at site for viewing by allottees and to be handed over to the association of allottees? 7 Whether all relevant records including sanctioned building plans, utility drawings, various test reports / results have been properly kept in the prescribed formats to be handed over to the association of allottees? B Anyinnovative / co steffective / greentechnoloryhas be e n us edforimprovingqu ality/ energyefficiency?P1eas e spe cify YoursFaithfully, Signature of Engineer Name: Qualification: License No.: MobileNo: Place: ptedby 5 LAT.J DEVELOPER BhUShan Disitallysisned q aqLI eJ Signaturpn{flnemoter PI\RTNER Raiesh ll:["T-t!"r: Date: lO/O5/2025 Pip arh ete ?i:?3:'i,?'cl?