B.l~."PIP ARH.ETE CONSUL TING ARCHITE CT & CIVIL ENGINEE R. A WING 202, RAJAT SANKUL NEAR GANESHPE TH BUS STOP NAGPUR- 440012. E- maU: - bhust,anp lp2023@gm all.comfOR M 1 [see Reg ul ation 3} ANNEXURE A FORM 1 (SEE REGULATION 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of registratio n of Ongoing Project and for withdrawa l of Money from Designate d Bank Account) OCTOBER TO DECEMBER QUARTER 2025 To , Date: 15-01-202 6 M/S SHIVLAXM I LAND DEVELOPE RS (Mr. Sanjay Madhukar rao Mahakalka r & Mr. Nandlal S. Sahu, Partners), 97, Ridge Road, Raghuji Nagar Nagpur- 440024 Subject: Certificate of Percentage of Completion of Constructi on of SHIVANKAR LAYOUT at Kh. No. 64/4 having MahaRERA Registratio n Number P50500054 417 (Only applicable after project registration ) beinab developed by M/s Shivlaxmi Land Developers . Sir, I/We have undertake n assignmen t as Architect/ Licens,ed Surveyor of certifying Percentage of Completion of Constructi on Work of SHIVANKAR LAYOUT at Kh. No 64/4 having MahaRERA Registratio n Number P5050005 44 l 7 being developed by M/ s Shivlaxmi Land Developers . Based on site inspection , with respect to Layout/eac h of the Building/ Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate , the Percentage of Work done for each of the Building/ Wingof the Real Estate Project under MahaRERA is as per Table A herein below. The percentag e of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE A Building - N/ A t (to be prepared ~c pa ralcly for each Building/ Wing of the Real ES ate Project) - Percenta ge of I Actual Work SR. Done Tasks / Activity No. (As on date of (2) (11 the certificat e) (3) -1 -- Excava Lion NO NO rn cm s (if an y) 2 3 - Basc Podium s (ii an y) NO NO 4 Plmth NO 5 Stilt Floor NO 6 Sl a bs of su per structure Internal Walls, Internal Plaster, Floorings, Door~ and NO 7 windows within Flats / Premises 8 San itary Fittings within the Flat / Premises NO I I Staircases , Lifts wells and Lobbies at each Floor Level NO 9 Overh ead and Undergro und water tanks External Plumbing and External Plaster, elevation, 10 completio n of terraces with waterproo fing of the Building/ NO Win g Installatio n of Lifts, water pump, Fire Fighting Fittings and Equipmen t as per CFO NOC, Electrical fittings , mechanic al I equipmen t, com pliance to conditions of environm ent/ CRZ NOC , finishing to entrance lobby/s, plinth protection , NO 1I paving of areas appu rtenant to Building/ Wing, Compoun d wall and all other requireme nts as may be required to I complete project as per specificati ons in agreemen t of sale . Any Other Activities TABLE B Common Areas (Internal and External Developm ent Works) in respect of the Registere d Phase / Project Number Percentag e of Actual Work SR. Common Areas and Proposed (Yes Done NO. Details Facilities / No) (As on date of (1) (2) (5) (3) the certificat e) {4) I Internal Road & Foot paths YES 90% NO 2 Water Su ooly NO NO NO 3 Sewerage (Chamber lines, Seo tic Tank STP) YES 95% SEPTIC TANK 4 Strom Water Drains NO NO NO Lands capi ng und tree -- - -- 1or½, 5 Planti nR YES NO - 6 Street Lightin g YES 80% NO 7 Co1,1mtmi~ Buildin gs NO NO NO T'rcntment and disposal of s sewerage and sullage YES 90% NO water. Solid Waste Management NO NO 9 and Disposal NO I Water conservation / Rain NO NO NO 10 Water Harvesting NO NO NO 11 Energy Management Fire protection and fire NO NO I NO 12 safety requirements Electrical Meter room, YES 90% NO 13 substation, receiving station. Others (Option to add NO NO NO 14 more) Yours Faithfully, Signature & Name of Architect Bhushan Digitally signed b, • h RaJes Bhushan RaJest·, PiparhPte Date: 2026.02. i 1 17 14:48 License No : +0S'J0' Piparhete Agi·eed and Accepted by: Signature of Promoter Name: PARTNER Date: 15/01 /2026