B.R.PIPARHETE CONSUL TING ARCHITE CT & CIVIL ENGINEE R. A WING 202, RAJAT SANKUL NEAR GANESHPE TH BUS STOP NAGPUR- 440012. E-mail:-bhu shanpip202 3@gmail.co mF0RM 1 [see Regulation 31 ANNEXUREA FORM 1 (SEE REGULATION 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of registratio n of Ongoing Project and for withdrawa l of Money from Designated Bank Account) JULY TO SEPTEMBER QUARTER 2025 To, Date: 15-10-2025 M/S SHIVLAXM I LAND DEVELOPERS (Mr. Sanjay Madhukarrao Mahakalkar & Mr. Nandlal S. Sahu, Partners), 97, Ridge Road, Raghuji Nagar Nagpur-44 0024 Subject: Certificate of Percentage of Completion of Constructi on of SHIVANKAR LAYOUT at Kh. No. 64/4 having MahaRERA Registratio n Number P50500054 417 (Only applicable after project registration ) being developed by M/s Shivlaxmi Land Developers . Sir, I/We have undertaken assignmen t as Architect/ Licensed Surveyor of certifying Percentage of Completion of Constructio n Work of SHIVANKAR LAYOUT at Kb. No 64/4 having MahaRERA Registratio n Number P50500054 417 being developed by M/s Shivlaxmi Land Developers. Based on site inspection, with respect to Layout/ each of the Building/ Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the Building/ Wingof the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE .A . Building - N / A (lo be pre p ru·e d se par ate ly for each Building/Wing of the Real Estate Projec t) Percentage of I Actual Work SR. Done No. Tasks / Activity (2) (As on date of ( 1) the certifi~Jlte) (3) 1 Excavation NO 2 Base m ents (if any) NO 3 Podiums (if any) NO 4 Plinth NO 5 Stilt Floor NO 6 Slabs of su p er t.tructure NO 7 Internal Walls , Internal Plaster, Floorings , Doors and NO windows within Flats / Premises 8 Sanitary Fittin gs within the Flat / Premises NO 9 Staircases , Lifts wells and Lobbies at each Floor Level NO Overhead and Underground water tanks External Plumbing and External Plaster, elevation, 10 completion of terraces with waterproofing of the Building/ NO Wing Installation of Lifts , water pump, Fire Fighting Fittings and Equipment as per CFO NOC , Electrical fittings , mechanical equipment , compliance to conditions of environment/ CRZ NOC , finishing to e ntrance lobby /s , plinth protection, 11 NO paving of areas appurtenant to Building/ Wing, Compound wall and all other requirements as may be required to complete project as per specifications in agreement of sale . Any Other Activities TABLE B Common Areas (Internal and External Development Works) in respect of the Registered Phase / Project Number Percentage of Actual Work SR. Common Areas and Proposed (Yes Done NO. Facilities / No) (As on date of Details (1) (2) (3) the (5) certificate) 14) 1 Internal Rq ad & Foo tpaths YES 65% NO I ' 2 Water Su ooly NO NO NO 3 Sewerage (Chamber lines Septic Tank, STP) ' YES 70% SEPTIC TANK 4 , Strom Water Drains NO NO NO 7 Landscapi ng :md tree 5 Planti n g YES 50% NO 6 Street Li~hlin g YES 60% NO 7 Cornmuni ty Buildings NO NO NO Treatment and disposal of 8 sewerage and sullage YES 80% NO water. Solid Waste Management NO NO 9 NO and Disposal Water conservation/ Rain NO NO 10 NO Water Harvesting NO NO 11 Energy Management NO Fire protection and fire NO NO 12 NO safety requirements Electrical Meter room, NO 13 substation, receiving YES 70% station. Others (Option to add NO NO NO 14 more) z e.. ... Yours Faithfully, I Bhushan Digitally signed Signature & Name of Architect by Bhushan Rajesh Rajesh Piparhete License No: Date: 2026.02.11 Piparhete 1?:1s:44 +os•30• Agreed and Accepted by: Signature of Promoter SHI 'LAXMI LAND 'SfVELOPER Name: 4J~c,/~ ~'!;J Date: 15/10/2025 PARTNER PART~