B.R.PIP ARHETE CONSULTING ARCHITECT & CIVIL ENGINEER. A WING 202, RAJAT SANKUL NEAR GANESHPETH BUS STOP NAGPUR- 440012. E-mail:-bhushanp ip2023@g mail.comFORM 1 [see Regulation 3] ANNEXUREA FORM 1 (SEE REGULATION 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of registration of Ongoing Project and for withdrawal of Money from Designated Bank Account) APRIL TO JUNE QUARTER 2025 To, Date: 15-07-2025 M/S SHIVLAXMI LAND DEVELOPERS (Mr. Sanjay Madhukarrao Mahakalkar & Mr. Nandlal S. Sahu, Partners), 97, Ridge Road, Raghuji Nagar Nagpur-440024 Subject: Certificate of Percentage of Completion of Construction of SHIVANKAR LAYOUT at Kh. No. 64/4 having MahaRERA Registration Number P50500054417 (Only applicable after project registration) being developed by M/s Shivlaxmi Land Developers . Sir, I/We have undertaken assignment as Architect/ Licensed Surveyor of certifying Percentage of Completion of Construction Work of SHIVANKAR LAYOUT at Kb. No 64/4 having MahaRERA Registration Number P50500054417 being developed by M/s Shivlaxmi Land Developers. Based on site inspection, with respect to Layout/ each of the Building/ Wing of the aforesaid Real Estate Project. I certify that as · on the date of this certificate, the Percentage of Work done for each of the Building/ Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. I TA B L E A Bui ldin g - N/A (to he p t't' prn-cd :-.c p a rnt.e ly for eac h Bu ildin g /Wi n g of th e Re al Esta te Proj ect) l - Per cen tage of SR . Tas ks / Act ivit y Act ual Work No . ' (2) Don ~ ( l) (As on dat e of the 1 Exc ;ava ti o n cert ific ate) (3) 2 Bas e m e n ts (if an y) NO 3 Pod ium s (if an y) NO 4 Plin th NO 5 Stil t Flo or NO 6 Sla bs of su p ~r stru ctu re NO Inte rna l Wa lls , Inte rna l Plas ter , Floo NO 7 ring s , Doo rs and win dow s wit hin Fla ts / Prem ises NO 8 San itar y Fitt in gs with in the Flat / Pre mis es NO 9 Sta irca ses , Lift s wel ls and Lob bies at eac h Floo r Lev el O v e r hea d and Und ergr oun d wat er NO tank s Ext ern al Plu mbi ng and Ext erna l Plas 10 ter, elev atio n , com plet ion of ter race s with wat erpr oofi ng of the Buildin g/ NO W in g Inst alla tion of Lift s, wat er pum p, Fire Figh ting Fitt ings and Equ ipm ent as per CFO NOC , Elec trica l fitti ngs , mec han ical equ ipm ent , com plia nce to con diti ons of env iron men t/ CRZ NO C , fini shin g to entr anc e lobb y /s 11 , plin th prot ecti on , pav ing of are as app urte nan t to Bui NO ldin g/ Win g, Com pou nd wal l and all oth er requ irem ents as may be requ ired to com plet e pro ject as per spec ifica tion s in agre eme nt of sale . Any Oth er Act iviti es TABLE B Com mo n Are as (Int ern al and Ext ern al Dev elop men t Wor ks) in res pec t of the Reg iste red Pha se / Pro ject Num ber Per cen tag e of SR. Com mo n Are as and Act ual Wo rk Pro pos ed (Yes Don e NO. Fac iliti es Det ails / No) (As on dat e of (1) (2) (5) (3) the cer tific ate) (4) 1 Inte rna l Roa d & Foo tp ath s YES 35% NO 2 Wa ter Su pply NO NO NO Sew erag e (Ch amb er line s, 3 S ept ic Tan k, STP) YES 40% SEP TIC TAN K 4 S t rom W a ter Dra ins NO NO NO - 5 Landsca ping a nd Lrcc YES 30% NO Plantin g -6 Stred Lightin g YES 40% NO 7 Co mmuni ty Buildings NO NO NO Treatment and disposal of 8 sewerage an d sullage 45% NO YES water . Solid Waste Management NO 9 NO NO and Disposal Water conservation / Rain NO NO 10 NO Water Harvesting NO NO 11 Energy Management NO Fire protection and fire NO NO 12 NO safety requirements Electrical Meter room, 35% NO 13 substation, receiving YES station . Others (Option to add NO NO 14 NO more) Yours Faithfully, Signature & Name of Architect Bh usha n Digitally signed License No : by Bhushan Rajesh Rajesh Piparhete Date: 2026.02.11 Agreed and Accepted by: Piparhete 17:1s:14+os•30• Signature of Promoter ~V~~Ml~ND ~ELOPER Name : f~ "9()/~ Date: 15/07/2025 PARTNER PARTN~