B.R.PIPARHETE EET{SULTINE ARtrHITEtrT & EIVII- ENEINEER. A WING 2O2, RAJAT SANKUL NEAR GANESHPETH BUS STOP NAGPUR-44OO12. E-mail:-bhushanpio202S@qmail.comFORM 1 [see Regulation 3] ANNEXURE A FORM 1 (sEE REGULATTON 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of registration of Ongoing Project and for withdrawal of Money from Designated Bank Account) JANUARY TO MARCH OUARTER 2025 To, Date: |O-O4-2O25 M/S SHTVLA>(MI LAND DEVELOPERS (Mr. Sanjay Madhukarrao Mahakalkar & Mr. Nandlal S. Sahu, Partners), 97, Ridge Road, Raghuji Nagar Nagpur- 44OO24 Subject: Certificate of Percentage of Completion of Construction of SHwANI(AR LAYOUT at Kh. No. 6414 having MahaRERA Registration Number P5O5OOO544L7 (Only applicable after project registration) being developed by M/s Shivlaxmi Land Developers. Sir, I/We have undertaken assignment as Architect/ Licensed Surveyor of certifying Percentage of Completion of Construction Work of SHIVANIIAR LAYOUT at Kh. No 64l4having MahaRERA Registration Number P5O5OOO544L7 being developed by M/s Shivlaxmi Land Developers. Based on site inspection, with respect to Layout leach of the Building/ Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the Building/ Wingof the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE A Building - N/A (to be prepared separately for each Building/Wing of the Real Estate Project) SR. Tasks / Activity Percentage of No. (21 Actual Work (U Done (As on date of the certificate) (3| 1 Excavation NO 2 Basements (if any) NO J Podiums (if any) NO 4 Plinth NO 5 Stilt Floor NO 6 Slabs of super structure NO 7 Internal Walls, Internal Plaster, Floorings, Doors and NO windows within Flats/ Premises B Sanitarv Fittings within the Flat/ Premises NO 9 S taircases, Lifts wells and Lobbies at each Floor Level NO Overhead and Undergroq4{ water tanks 10 External Plumbing and External Plaster, elevation, NO completion of terraces with waterproofing of the Building/ Wing 11 Installation of Lifts, water PumP, Fire Fighting Fittings and NO Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/ CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/ Wing, Compound wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any Other Activities TABLE B Common Areas (Internal and Brternal Development Works) in respect of the Registered Phase / Project Number SR. NO. Common Proposed (Yes Percentage of Details (1) Areas and / Nol Actual Work (s) Facilities (31 Done l2l (As on date of the certificate) (4) 1 Internal Road YES t5% NO & Footpaths 2 Water Supply NO NO NO J Sewerage YES l5o/o SEPTIC TANK (Chamber lines, Septic Tank, STP) 4 Strom Water NO NO NO Drains 5 Landscaping YES Oo/o NO and tree Plantins 6 Street Liehtine YES 2Oo/o NO Community NO NO NO Buildings B Treatment and YES 25% NO disposal of sewerage and sullage water. 9 Solid Waste NO NO NO Management and Disposal 10 Water NO NO NO conservation / Rain Water Harvesting 11 Energr NO NO NO Management 72 Fire protection NO NO NO and fire safety requirements 13 Electrical YES 75% NO Meter room, substation, receiving station. 14 Others (Option NO NO NO to add more) Yours Faithfully, Signature & Name of Architect BhUShan Disitally sisned License No: Raiesh i:,1i;'4;1oot Agreed and Accepted by: Pip arh ete ?;,:;,i3'i,"'il? SH DEVELOPER -,/ n o-Qal r et\ O- ture of P'oFlSfnen PAR Name: Date: lOlO4/2025