B.R.PIPARHETE CONSULTING ARCHITECT & CiVIL ENGINEER. A WING 202, RAJAT SANKUL NEAR GANESHPETH BUS STOP NAGPUR 440012. E-mall:-bhushanplp2023@gmall.comFORM 1[see Regulation 3] ARCHITECT"S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 01-12-2023 To, SHRI.- NANDLAL HARILAL SHAHU. SHIVLAKSHMI LAND DEVLOPERS THROUGH SHRI.- SANJAY MADHUKAR MAHAKALKAR. Add.- Tah.- Kamptee. Dist.-nagpur. Subject: Certificate of Percentage of Completion of Construction Work of the entire Project having MahaRERA Registration Number Situated on the land bearing Survey No. 64/4. PH. NO.-33, Demarcated by its boundaries by 18.00 Mt. Wide Road, to the East, by Nala, to the South, Survey no. 63, to the West, Survey N0.- 64/3, to the North, of Division, Nagpur - Village Tarodi (Khu), Tah. Kamptee, Dist. Nagpur, Admeasuring 11894.64 Sq. Mtrs. area being developed by SHRI.- NANDLAL HARILAL SHAHU. SHIVLAKSHMI LAND DEVLOPERS THROUGH SHRI.- SANJAY MADHUKAR MAHAKALKAR. Sir, I/ We B. R. Piparhete have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of the entire Project having MahaRERA Registration Number NA (Only Applicable after project registration) being developed by SHRI.- NANDLAL HARILAL SHAHU. SHIVLAKSHMI LAND DEVLOPERS THROUGH SHRI.- SANJAY MADHUKAR MAHAKALKAR. Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project, Icertify that as on date of this certificate the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table Aherein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B TABLE -A Layout / Building/ Wing Nunber (to be prepared separately for each Layout / Building / Wing of the Project) S Task / Activity Percentage of No, (2) Actual Work Done (1) (As on date of the Certificate) (3) 1 Excavation 2 Basements (if any) 3 Podiums (if any) 4 Plinth 5 Stilt Floor Slabs of Super Structure 7 Internal walls, Internal Plaster, Floorings, Doors and Windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and Underground Water Tanks 10. External plumbingand external plaster, elevation, completion of terraces with waterproofing of the Building/Wing. 11 Installation of lifts, water pumps, Fire Fighting Fittings And Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building / Wing, Compound Wall and allother requirements as maybe required to complete project as per specifications in agreement of Sale. Any other activities. Table B Common Areas (Internal and External Development Works) in respect to the Registered Phase / Project Number Sr.No Common areas Proposed Percentage of Details (1) and Facilities. (Yes/No) Work done (5) (2) (3) (As on date of the Certificate) 1 Internal Roads& Yes 00% Footpaths 2 WaterSupply Yes 00% 3 Sewerage (chamber, lines, Yes 00% Septic Tank, STP) 4 Storm Water Drains Yes 00% 5. Landscaping &TreePlanting Yes 00% 6 Street Lighting Yes 00% 7 Community Buildings Yes 00% 8 Treatment and disposal of No 00% sewage and sullage water 9. Solid Waste management & N 00% Disposal 10. Water conservation, Rain Yes 00% water harvesting 11. Energy management Yes 00% 12. Fire protection No 00% And fire safety requirements 13. Electrical meter room, sub Yes 00% station, receiving station 14. Others (Option to Add more) B. R. PiPARHETE Consulting Architect & Engineer STATEIRI2023/APL/0595 1/N MRDA.s A-Wing-202, Rajput Sankut. t.: Ganesh Peih Bus Stop, Nugp. (M) 9325116543, 8412%:9