MAHESH BALPANDE CIVIL ENGINEER Third Floor, N.K.Y. Towers, AjaniSquarc Wardha Road, Nagpur -440015 Mob.: 7387674435, Email ID:maheshbalpande22(@gmail.com Annexure - B FORM -2 [See Regulation 3] ENGINEER'S CERTIFICATE Project and for Withdrawal of Money from Designated (To be submitted at the time of Registration of Ongoing Bank Account) For the Quarter April to June 2024 Date:-30/06/2024 To, The TirupatiDevelopers, 3rd Floor NKY Towers, Ajani Square, Wardha Road, Nagpur - 440015 Park-15 having MahaRERA Subject :-Certificate of Cost Incurred for Development of Silver Registration Number P50500054435 being Developed by Tirupati Developers. Sir, Certifying Estimated Cost for SilverPark-15 having MahaRERA 1|Mahesh Balpande have undertaken assignment of Registration Number P50500054435 being Developed by Tirupati Developers. 2 We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate specifications mentioned in the Agreement of Sale. Our the completion of internal & external works of the Project as per available to us for the Project under Reference by the calculations are based on the Drawings/Plans made estimated cost required for the entire work as calculated by Mr. Mahesh Developers / Consultants. The Schedule of Items & Quantity the assumption of the cost of material, labour &other Balpande Project Manager appointed by the Developer/Engineer, carried out by us to ascertain / confin the above analysis given to us. inputs made by the Developer, and the Site Inspection aforesaid Project mentioned under reference at 3 We estimate Total Estimated Cost of completion of the Total Cost of Project 1,46,92,230.00(Total of Table A&B) at the time of Registration. The estimated completion internal & apartments & proportionate is with reference to the Civil, MEP & Allied Works completion of the of Sale &for the Building(s) / Wing(s) / Layout / Plotted external works, as per the specifications mentioned Agreement obtaining OcCupation Certificate /Completion Certificate for Development from the NMRDA being the Planning for purpose of Project is being implemented. in the Authority under whose jurisdiction the aforesaid 1,39,57,618.50(Total of Table A & B), The 4 The Estimated Cost incurred till date is calculates to materials / services used &unit cost of these items. Amount of Estimated Cost Incurred is calculated on the basis of input internal Works for completion of Apartments & proportionate completion of 5 The Balance Cost of completion of the Civil, MEP &Allied aforesaid Project &external works, as per specifications mentioned in Agreement of Sale, of the is estimated at 7,34,611.50(Total of Table A&B). 61Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & external works, as per the completed on the date of this certificate is as given specifications mentioned in Agreement of Sale, of the aforesaid Project as in Table A & B below: TADLE -A Building /Wing / LAyout / Plotted Development bearing Number or called (to be prepared separately of each Building / Wing / Layout / Plotted Development of the Real Estate Project) S, No. Particulars Amount (in Rs) Total Estimated Cost of Building / Wing I Layout / Plotted Development as on date of Registration is Cost incurred as On date of Certificate NA Work Done in Percentage (as Percentage of Estimated Cost) |Balance Cost tobe incurred" (based on Estimated Cost) 5 Cost incurred on Additional / Extra Items not included in the Estimated Cost (Table-C) Note : Not applicable in case of Projects in Plotted Development and Sale of Land TABLE - B Internal & External Development Works in respect of Registered Phase S. No. Particulars Amount (in Rs.) 1,46,92,230.00 Total Estimated Cost of Internal &External DevelopmentWorks? including amenities &facilities in the Layout as on date 1,39,57,618.50 Cost incurred as on date of Certificate 95 00% Work Done in Percentage 7,34,611.50 4 Balance Cost to be incurred Cost incurred on Additional / Extra Items not included in the NIL Estimated Cost (Table-C) Yours faƤthfuy. Mr. Mahesh Balpande (NIT/BE(W)y4695/528) (Not less than Bachelor's Degree Holder or equivalent as per Section 2(u) of the Act) :B.E (Cvil) irup tiDeve rd Roor. Agreed &Accepted by: Ajni Square, Werdha Road./ Nagpur Signature of Promoter Name : Rahul Arunrao Unganlawar Date : 3O/06/2024 Note: 1.The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time as per specifcations mentioned in the Agreement to Sale. 2.()Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on by Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (") &in case quantiy are being calculated by office of Engineer, the name of person in the offce of Engineer, who is responsible for the quantily calculated should be mentioned at the place marked ("). 3.(*") Balance Cost to be incurred (4) may vary from difference between Total Estimated Cost (1) &actual Cost incurred (2) due to deviation in quantity required /escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate Project will result in an amendment of the cost incurred / to be incurred. 4.Allcomponents of work with specifications are indicative ¬ exhaustive 6Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from speciflcations in Agreement of Sale TABLE -C List of Extra / Additional / Deleted Items considered in the Cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra / Additional / Deleted Items Amount (in Rs.) 1 NIL 2