S. SHIRKE . PRADHU NAGAR NEW 4-01, VRUNDAWAN An . 1 ADHINAV SOC NAG.AR, SOMAL ADA, - -· -- - .. ___ _ __ _ _ NAGPUR 40005. PH. NO. 976 S40 28S ~SH FORM-2A [See Regulation 3A.] LITY ASSURANCE ENGINEERS'S CERTIFICATE FOR QUA I • (Site Supervisor's Certificate) Year) (To be submitted at the end of Financial Date: 09/04/2026 To, The Ojaswita Construction ur, 440015 Nagpur (M Corp.), Nagpur (Urban), Nagp Quality Assurance Certificate Ending 31ST MARCH 2026) (Certificate No ....................... for the Year manship of the work of used and quality of Construction and work Subject : Certificate for quality of materials loped by Ojaswita istration Number P50500053129 being deve VRUNDAVAN-111 having MahaRERA Reg Construction Sir, estate project undertaken an assignment of supervision of this real IM/e HEMANT SURESH SHIRKE have Our Responsibility approved plan, to submit the development permission and as per the To carry out the work in accordance with d laboratory as per prevailing ficate of supervision of work, to carry out material testing in-situ or in an authorize certi d specifications, and as per ity of work and workmanship as per prescribe and applicable standards, to ensure qual tice. NBC and I or other relevant code of prac The details of the quality are as follows : ing 1. Structural Design, Stability and Test Yes/No Remarks Sr. No. Parameters 1,, , been Yes Soil investigation has been conducted 1 Whether soil investigations of the site has soil before the structural design and soil conducted before the structural design and the parameters have been considered. paramete rs have been accounte d for in structural design/drawings? inted for Yes Name: P.Y. GHUSHE 2 Whether Structural Engineer has been appo License No: 062909-4 the project? Mobile: 0982271696 E-mail: info@pyghushe.com r book Yes Inspection re~isters, site order book, and 3 Whether the inspection registers, site ordetained at quality contro registers are properly and quality control test registers are main ineer-in- maintained and endorsed. the site rroperly and endorsed by the Eng Charge of material No 4 Whether testing facilities to check quality is available at site? Sr. No. 1 Pt11"'-ttfl YHl~o Remarks I 5 Whether the statue~ provisions for disaster Yes Provisions for disaster resistence/earthqua e resistant desl~n have been resistance/earthquake resistant design incorporated, specially in case of mu ti-storeyed are incorporated. construction? 6 Has suitable cognizance been taken on demarcated Yes Flood lines and local flooding precautions flood lines and appropriate precautions taken for are taken care of but the Area doesn't rotecting the site from flooding considering local comes under Flood Affected Zone. ~ooding issues? 2. Input Materials - Sr. No. Parameters Yes/No Remarks y 1 Whether the followin~ building materials confirm to Yes relevant IS/BS/NBC ode, or as per Industry Standards? If yes, provide details: (a) Cement, concrete and coarse aggregate Yes OPC/PPC cement (such as Ultratech. ACC, Ambi·a) all Confirming to IS:456. Readv Mix oncrete (RMC) (b) Steel and its alloys Yes Fe 500/550 grade (such as Tata, JSW, or equivalent) as per IS:1786 (c) Electrical wire, fittings and accessories Yes Polycab, Havells along with modular switches and MCBs confirming to IS:732 and IS:3043 (d) Plumbing and sanitary fittings Yes CPVC/UPVC (such as Astral, Supreme, Finolex) like Cera. Jaguar or equivalent conforming to IS:4985 and IS:13592. 2 VVhether regular tests of materials and construction Yes GEOTECH LAB products are being done from accredited labs also? If yes, details of such labs 3 VVhether manufacturer test certificate for cement, No steel, pipes etc. have been obtained and whether supply records are being maintained? 4 VVhether suitable water is being used for Yes construction? (i) VVhat is the source of water? Yes BOREWELL (ii) Has water been tested and approved by Yes Engineer-in-Charge before construction? (iii) Has water been tested subsequently as per Yes requirement? 3. Quality of Workmanship Sr. No, Parameters ' ) Yes/No Remarks \ q 1 VVhether works of all the electrical Yes Electrical works includi~ wiring, lift wirinff/connections/lift installation/other electrical installations, etc., carri out by insta lations have been carried out under authorized electrical engineers with authorized/registered electrical engineer and records maintained. whether records of the same has been maintained? 2 Whether all related works of plumbing & sanitary Yes All works are under supervision of skilled including installation of water supply systems, professionals, and workmanship/quality is drainage systems, sewage systems, sinks, toilets satisfactory within permissible limits. etc. have been carried out under authorized/registered plumbers/sanitary contractors and whether records of the same has been maintained? Sr. No. Parameters Yes/No Remarks , 3 Whether all the work is being carried out under Yes All works are under supervision of skilled supervision of experienced and skilled professional? professionals, and workmanship/quality is Further, whether the workmanship and quality is satisfactory within permissible hmits. satisfactory and up to the mark and the work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? 4 Whether remedial measures are undertaken to Yes Remedial measures against dampness prevent dampness and leakages? If yes, provide and leakage undertaken - Dr. Fix1t K2 details Crete used. 5 Whether safety precautions are undertaken during Yes Safety precautions for workers during construction activities for all type of workers? construction are being followed. 4. Miscellaneous Sr. No. Parameters Yes/No No t 1 Wnether third party quality inspection is being No carried out on site during/after completion of the works? If yes, provide details. 2 Wnether anti-termite treatment has been undertaken Yes Anti-termite treatment for the soil has for the soil? been duly carried out in accordance with the approved specifications 3 Wnether fire-fighting arrangements has been Yes Licensed Fire Safety Consultant and Fire undertaken under supervision of fire consultant? Protection Engineer are hired. 4 Wnether proper signages have been installed on Yes site/completed building as per requirement? 5 Whether precautions are undertaken to avoid air Yes GREEN NETS HAS BEEN USED pollution during construction? Please specify. 6 Whether records of all test reports/results have been Yes The records of all test reports and results properly kept in the prescribed formats and whether appear to have been maintained. the same are available at site for viewing by allottees and to be handed over to the association of allottees? 7 Whether all relevant records including sanctioned Yes All relevant records including sanctioned building plans, utility drawings, various test plans, utility drawings, test reports are reports/results have been properly kept in the properly kept and will be handed over to prescribed formats to be handed over to the the association of allottees. association of allottees? 8 Any innovative/cost effective/green technology has Yes RAINWATER HARVESTING been used for improving quality/energy efficiency? Please specify. Yours Faithfully ~ HEMANT S. SHIRI