t So §HJIRKE FORM-2A [See Regulation 3A.] ENGINEERS'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at the end of Financial Year) Date: 11/07/2025 To, The Ojaswita Construction Nagpur (M Corp.), Nagpur (Urban), Nagpur, 440015 31/03/2025 Quality Assurance Certificate (Certificate No.......................for the Year Ending ...................... ) . . of materials used and quality of Construction and workmanship of the work of Subject : Certificate for quality VRUNDAVAN-111 having MahaRERA Registration Number P50500053129 being developed by Ojaswita Construction Sir, I HEMANT SURESH SHIRKE have undertaken an assignment of supervision of this real estate project Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing·in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as fallows : 1. Structural Design, Stability and Testing 1 Whether soil investigations of the site has been Yes conducted before the structural design and soil parameters have been accounted for in the structural desi n/drawin s? 2 Whether Structural Engineer has been appointed for Yes Name: P.Y.GHUSHE the project? License No: 062909-4 Mobile: 0982271696 E-mail: info@pyghushe.com 3 Whether the inspection registers, site order book Yes and quality control test registers are maintained at the site proper1y and endorsed by the Engineer-in- Char e? 4 Whether testing facilities to check quality of material Yes is available at site? Page 1 of 3 I Wh,ether the statuary provisions for disaster Yes resistance/earthquake resistant design have been incorporated, specially In case of multt-storeyed construction? 6 Has suitable cognizance been taken on demarcated Yes flOOd lines and appropriate precautions taken for protecting the site from flooding considering local flOOdin issues? 2. Input Materials Whether the followinibuilding materials confirm to relevant IS/BS/NBC ode, or as per Industry Standards? If es, provide details: (a) Cement, concrete and coarse aggregate Yes Cement IS:269:2015, Concrete IS:456, A re ate IS:383 (b) Steel and its alloys Yes Steel IS:1786-2008 TMT (c Electrical wire, fittin sand accessories Yes (d Plumbing and sanita fittin s Yes 2 Whether regular tests of materials and construction No products are being done from accredited labs also? If yes, details of such labs 3 Whether manufadurer test certificate for cement, No steel, pipes etc. have been obtained and whether supply records are being maintained? 4 Whether suitable water is being used for Yes construction? (i) What is the source of water? Yes Borewell water (ii) Has water been tested and approved by Yes Engineer-in-Charge before construction? (iii) Has water been tested subsequently as per Yes requirement? 3. Quality of Workmanship 1 Whether works of all the electrical Yes wiring/connections/lift installation/other electrical installations have been carried out under authorized/registered electrical engineer and whether records of the same has been maintained? 2 Whether all related works of plumbing & sanitary Yes including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized/registered plumbers/sanitary contractors and whether records of the same has been maintained? 3 Whether all the work is being carried out under Yes supervision of experienced and skilled professional? Further, whether the workmanship and quality is satisfactory and up to the mark and the work is within the acceptable and J)ermisslble limits of deviations as per relevant Code of Practice? Page 2 of 3 s are undertaken to Yes Wat.er Proofing to all unwanted source of Whether remedial measure leakages? If yes, provide water. prevent dampness and details rtaken during Yes 5 Whether safety precautions are unde of work ers? construction activities for all e 4. Miscellaneous • • ✓., -••,/; . ~fw V~• .1;. ;,~: l~7; ~ I? ·1 ~-- •. ···,.•,..,~~ ,} •·••~1 'J•'•1; •-. '.: / •"'~'· . ." . ' : ; , < , ~ ; i " " ' ' ' ·' -''L;..'1 ~ • '.I -~•-· ' ,~.i: ·:,, '·••4 ' ~ . :\_: -~ '-.. . .. ..,,., ~··, ••••,._ ., ' ' ' ~-• ~~~, -. _,uo',,;••· ·\,.. . "(\...J...... • .....,_t ' ' • i • , ~ \_t I ;;~ , ► ~-~- ':·/:~ ~~ ·-=· ; ·.. ·.-~,<. ., bein~ No 1 Whether third party quality inspection is n oft e carried out on site during/after completio works? If yes, provide details. undertaken No 2 Whether anti-tennite treatment has been for the soil? been Yes 3 Whether fire-fighting arran~ements has cons ultant? unde rtake n unde r supe rviS1 on of fire insta lled on Yes Construction work is not yet completed. 4 Whether proper signages have beenirement? site/comp leted build ing as per requ n to avoid air Yes 5 Whether precautions are undertakese specify. pollution durinQ cons truction? Plea of all test repo rts/re sults have been No 6 Whether records and whether proper1y kept in the prescribed fonnatsing by the same are available at site for view association of allottees and to be handed over to the allottees? sanctioned Yes 7 Whether all relevant records including us test building plans , utility draw ings, vario in the reports/results have been proper1y keptto the prescribed fonnats to be handed over association of allottees? technology has Yes Rainwater Harvesting 8 Any innovative/cost effective/~reenergy efficiency? been used for improving quahty/en Please spec ify. Yours Faithfully H~mant Sh irk s ~ C\ " ' -_ &\i"rr\·ee v A. Cor,111100 1. - Signature of Engineer (Site Supervisor) Name: HEMANT SURESH SHIRKE Qualification (Not less than graduate) License No. (if any): NA Phone No: Place: For OJASWITA CONSTRUCTION Agreed and accepted \) I, -' ? AtJthorised Signatory Signature of Promoter Name: Ojaswita Construction Date: 11/07/2025 Page 3 ot3