ARCI'IITECTS URBAN PLANNERS anuradha - jayant tikkas INTERIOR DESIGNERS b.arch., m,tech.(urban planning) 6B/C Corporation Colony, Near NIT Skating Rink, Daga Layout Nagpur - 440 033 Ph.: 0712-3562324, 2232724 e-mail : ar.ajtikkas@gmail.com Annexure A FORM 1 [see Regulation 3] ARCHITECT'S GERTIFICATE (To be submitted at the time of Registration of ongoing Project and for withdrawat of Money from Designated Account) Date: g/,/ 1 lZoU To, OJASWITA CONSTRUCTION NAGPUR, MAHARASHTRA, 44001 5 subject : certificate of percentage of work of completion of construction work of VRUNDAVAN-ilt having MahaRERA Registration Number p50500053129 (onty Appticabte after project Registartion) being devetoped by OJASWITA CONSTRUCTION Sir, l/we JAYANT NATTHUJI TIKKAS have undertaken assignment as Architect /Licensed surveyor of certifying Percentage of completion of construction work of vRUNDAVAN-II! having MahaRERA Registration Number P50500053129 (Only Applicable after project Registration, being devetoped by OJASWITA cONSTRUCTTON ) Based on Site lnspection,with respect to Layout / each of the Building/wing of the aforesaid Real Estate project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A LayouUBuilding/Wing N umber: VRU NDAVAN-!il/NA Slabs of Super Structure lnternal walls, lnternal plaster, Floorings, Floors and windows ftapeprnqex _ _ with.ilthe FlaVPremises ' For OJAS|TITA CCI;STri,;.;;Ti 3l-l t h *t^' "r'fr)t' Page 1 of3 Sr. No. Tasks/Activity Percentage of Actual Work Done 1As an datc nf tho (]arfifi.lfa\ o Staircases, lifts Wells and Lobbies at each Floor level Overhead and 100.00 Underqround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 100.00 wateroroofino of the Buildino/wino. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 100.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Anv other activities. For 0JASWITA CCNSTRUCTioil _N"% ,/ -.'' I "Af.r' Au$orised Signatory Page 2 of 3 Table B - Gommon Areas (lnternal and External Development Works) in respect of Registered Phase / Project Number) Common areas and facilities ls Available Details Sr.No (Yes /No) Work Done (Ason date,of the (1) (21 (3) (4) (5) lnternal Roads & FootPaths No 0.00 NA 1 Yes 100.00 As per Norms 2 Water Supply As per Seweraqe (Chamber, Lines, Septic Tank ' STPf Yes 100.00 Norms J No 0.00 NA 4 Storm Water Drains No 0.00 NA 5 Landscapinq & Tree Planting No 0.00 NA o Street Liqhting 7 Communitv Bttildinqs No 0.00 tlA 0.00 NA o Treatment And Disposal Of Sewage And Sullage Wats No No 0.00 NA 9 Solid Waste Management And Disposal Yes 100.00 As per Norms 10 Water conservation /Rain water harvesting No 0.00 NA 11 Enerqv manaqemcnt Yes 100.00 As per Norms 12 Fire protection and fire safetv requirements As per Norms 13 Electrical meter room, su b-station, receivl4g sla !!qrl-- Yes 100.00 No 0.00 NA 14 Aooreoate area of recreational Open Space No 0.00 NA 15 Ooen Parkinq Yours FaithfullY {,i\ p$,, JAYANT NA' Signature & Name (lN ) of L.Si Architect ( License No: CA/99/25393) Date of Certificate: FgT OJASWITA CONSTRUCTION Agreed and accepted bY: il* ^.rrn*', -" lJ%orised sisnatory Signature of Promoter Name: Ojaswita Construction Date: oB lot I ZoZ 6 Page 3 of 3