ARCHITECTS URBAN PLANNERS anuradha - jayant tikkas INTERIOR DESIGNERS b.arch., m.t€ch.(urban planning) 6B/C Corporation Colony, Near NIT Skating Rink, Daga Layout Nagpur - 440 033 Ph.: 071 2-3562324, 2232124 e-mail : ar.ajtikkas@gmail.com Annexure A FORM 1 [see Regulation 3] ARCHITEGT'S CERTIFIGATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: o9 lot lZoZr To, OJASWITA CONSTRUCTION NAGPUR, MAHARASHTRA, 44001 5 Subject : Certificate of percentage of Work of completion of construction work of VRUNDAVAN-|I| having MahaRERA Registration Number P50500053129 (OnlyApplicable after project Registartion) being developed by OJASWITA CONSTRUCTION Sir, l/We JAYANT NATTHUJI TIKKAS have undertaken assignnrent as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of VRUNDAVAN-lll having MahaRERA Registration Number P50500053129 (Only Applicable after project Registration, being developed by OJASWITA CONSTRUCTION ) Based on Site lnspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Layout/Building/Wing N umber: VRU N DAVAN-!ll/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) ,| Excavation 100.00 2 Basements (if anv) 100.00 3 Podirrms (if anv'l 0.00 4 Plinth, 100.00 5 Stilt Floor 100.00 b Slabs of Super Structure 100.00 lnternal walls, lnternal plaster, Floorings, Floors and window, loooo W EX 7 Flats/Premises B Sanitarv Fittinq within the FIaUPremises %r"r,ilrar,\Fr\ 1oo.oo For lil m.Docsnots, IZ d&l r\bftrnt l8 7 \\z\#El#r, *.o, Page 1 of3 lvA Authorised Signatory Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) I Staircases, lifts Wells and Lobbies at each Floor level Overhead and 100.00 Underoround Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 100.00 eratornronfinn nf the Rr rildino/wino 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 90.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions oi environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving ol areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement ol Sale. Anv other activities. For OJASWITA CONSTRUCTION ,*rnatory Page 2 of 3 Table B - Common Areas (lnternal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities Proposed Pereentage of Actual Details (Yes / No) Work Done (As on date of the Certificate) (1) el (3) (4) (s) lnternal Roads & Footpaths No 0.00 NA 2 Water Supply Yes 100.00 As per Norms J Sewerage (Chamber, Lines, Septic Tank , STP) Yes 100.00 As per Norms 4 Storm Water Drains No 0.00 NA 5 Landscapino & Tree Plantinq No 0.00 NA 6 Street Liqhtino No 0.00 NA 7 Community Buildinqs No 0.00 NA 8 Treatment And Disposal Of Sewaoe And Sullaqe Water No 0.00 NA I Solid Waste Manaqement And Disposal No 0.00 NA 10 Water conservation /Rain water harvestino Yes 100.00 As per Norms 11 Energy manaqemcnt No 0.00 NA 12 Fire protection and fire safety requirements Yes 90.00 As per Norms 13 Electrical meter room, sub-station, receivinq station Yes 100.00 As oer Norms 14 Aqqreoate area of recreational Open Space No 0.00 NA 15 Open Parking No 0.00 NA Yours Faithfully /Architects' lnt. Designers' l""Gutha I Urban Pbnners Signature & Name (lN BLOCK LETTERS)of L.S/ Architect ( License No: CAJ99i25393) Date of Certificate: 09/07/2025 Agreed and accepted by: sisnature or promoter For olA$uulrA cffiucrnn Name: Ojaswita Cons itruction Date: 09/07/2025 trY " Authorlmd Slgnatory Page 3 of 3