401, VRUNDAWAN APT. 1 HEMANT S. SHIRKE SOMALWADA, ABHINAVSOC. PRABHU NAGAR, NEW MANISH NAGAR, NAGPUR 40005. PH. NO. 9765402858 Annexure B FORM 2 [see Regulation 3] ENGINEER'S CERTIFICATE (1o be submited at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project Wise) Date: 08 |o4|2025 To, Ojaswita Construction Nagpur, MAHARASHTRA,440015 Subject: Certificate of Cost Incurred for Development of VRUNDAVAN-Il having MahaRERA Registration Number P50500053129 (Only Applicable after project Registartion) being developed by Ojaswita Construction Sir, I/We HEMANT SURESH SHIRKE have of Certifying Estimated Cost for VRUNDAVAN-II| having MahaRERA Registration Number P50500053129 (Only Applicable after project Registration, being developed by Ojaswita Construction ) 2.We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal &external works of the project as per of sale. Our estimated cost calculations are bassd on specifications mentioned in agreements the drawings/plans made available to us for the project under reference by the Developer lConsulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor appointed by Developer/Engineer, the assumption other inputs made by developer,and the site inspection carried ofthe cost of material, labour and out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total estimated the Cost of completion of thc aforesaid project under reference at Rs. 40297500.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to thc Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal &external works,as per specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certificate / completion certificate for the Building(s) Wing(s)/ Layout /Plotted Development from the Nagpur Municipal Corporation being the Planning Authority under whose jurisidiction the aforesaid project is being implemented. 4.The Estimated Cost incured till date is calculated at Rs. 31717270.00 (Total of Table A and B),The amount of Estimated Cost incurred is calculated on the basis of input materials/services used and unit cost of these items. 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and Page 1 of 4 proportionate Complition of internal & Project is estimated 6.I certify à Rs 8580230.00 external works, as per specification mentioned in agreement of sale, ofthe (Total of Table A that the Cost of and B) externa the Civil, MEP and of this works,as per specification allied works the for the apartments and proportionate ate internal 8& certificate is as given in mentioned in agreement tof sale, of the aforesaid Project as completed on the date Table AandB below: Table-A Buldingl Wing ILayout Plotted Sr. No. Development bearing Number Total Estimated Cost of the Particulars :VRUNDAVAN-NA Amount (In Rs.) 2 Building/Wing/Layout Plotted Development as on date of Registration is 40297500.00 Cost incurred as on date of 3 certificate 31717270.00 Work done in Percentage (as Percentage of the estimated cost) Balance Cost to be Incurred*(Based 78.71 5 on Estimated Cost) Cost Incurred on the 8580230.00 Additional/Extra Estimated Cost (Table-C) items not included in the Page 2 of4 an' b. Table B Internal and External Development Sr. No. (1) Works in respect of the Total Estimated Particulars Registered Phase Cost of the Ploted Development Amount (In Rs.) 2 Cost inCurred as BuildingWing/Layout as on date of certificateRegistration is 3 on date of Work done in A Percentage Balance Cost to be (as percentage of the estimated cost) 0 5 Cost Incurred on theIncurred(Based on Estimated Cost) Estimated Cost (Tablc -C)Additional/Extra items not included 0 in the Yours Faithfully H^m1nt Shirke Amathgincer &Contractoz HEMANT SURESH SHIRKE Signature &Name (IN BLOCK LETTERS) with Stamp of [Not Less than bachelor's Degree Holder or equivalent asEngineer per Scction 2(u) of thc Act) Local Authority license no. NA (if applicable) Date of Certificate: Agreed and#rRNWITA CONSTRUCTION Signature of Promoter Name: Ojaswita Constr°etbnorised Signatory Date: oeloul2o2 1.The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2.(*) Quantity survey can be done by office of Engineer or can be done by an independent certificate of In case of independent quantity surveyor being appointed by Developer, the Quantity Surveyor,whose name has to be mentioned at the place marked (*) and in case quantity are being calculated by ofice of Engineer,the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked ("). 3.(**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for developmernt of the Real Estate Project will result in amendment of the cost incurred/to be incurred. 4.Allcomponents of work with specifications are indicative and not exhaustive 5.Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. Page 3 of 4