uln UMESH LAMGE ARCHITECT & INTERIOR DESIGNER 402, DAY A CHAMBER, AJNI SQ., WARDHA ROAD, NAGPUR-15 Mobile No.- 09822566554, E-maiIID-Iamge71@gmail.com DATE :- 31-12-2023 CERTIFICAT~ To Mis. BHAIJI INFRA PROJECTS PRIVATE LIMITED Resident of 102, Shri. Mohiniraj Apartment, Wing-A, Khare Town, Dharampeth, Shankar Nagar, Nagpur-440010 Subject: Certificate of Percentage of Completion of Development Work of the (Shyam Nagri 1) (Kh. No. - 133/2) Mouza - Pipia having MahaRERA Registration P50500053128 (Only Applicable after project Registration) being developed by [Mis. BHAIJI INFRA PROJECTS PRIVATE LIMITED] Sir, II We Umesh M. Lamge have undertaken assignment as Architect ILicensed Surveyor of certifying Percentage of Completion of Development Work of Mis. BHAIJI INFRA PROJECTS PRIVATE LIMITED having [Maha RERA Registration Number P50500053128] being developed by [Mis. BHAIJI INFRA PROJECTS PRIVATE LIMITED] Based on Site Inspection, with respect to the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for the entire Real Estate Project as each as registered vide number P50500053128 under Maha RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building /Wing Number __ (to be prepared separately for each Building /Wing of the Project) Sr. Tasks IActivity Percentage of No work done 1 Excavation Not Applicable 2 number of Basement(s) and Plinth Not Applicable 3 number of Podiums Not Applicable 4 Stilt Floor Not Applicable 5 Plinth Not Applicable 6 number of Slabs of Super Structure Not Applicabie 7 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors Not Applicable and Windows to each of the Flat/Premises 8 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Not Applicable Flat/Premises 9 Staircases, Lifts Wells and Lobbies at each Floor level connecting Not Applicable Staircases and Lifts, Overhead and Underground Water Tanks 10 The external plumbing and external plaster, elevation, completion of Not Applicable terraces with waterproofing of the Building/Wing, 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as Not Applicable per.CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation ICompletion Certificate NOTE. Table -A is not applicable to this project as it is a project of plotted development (layout of plots) and not construction of building. TABLE-B Internal & External Development Works in Respect of the entire Registered Phase SR. Common areas and Facilities, Proposed Percentage Details No. Amenities (Yes/No) of Work done 1 Internal Roads & Footpaths YES 00% Ongoing 2. Water Supply NO 3. Sewerage (chamber, lines, Septic YES 00% Ongoing Tank, STP) 4. Storm Water Drains YES 00% Ongoing 5. Landscaping & Tree Planting YES 00% ongoing Street Lighting YES 00% ongoing 6. 7. Community Buildings NO 8. Treatment and disposal of sewage NO and sullage water 9. Solid Waste management & Disposal NO Water conservation, Rain water YES 00% Ongoing 10. harvesting 11. Energy management NO 12. Fire protection and fire safety NO requirements 13. Electrical meter room, sub-station, NO receiving station Others (Open space) YES 00% Ongoing 14. .. NOTE- Entire development work in the project is ongoing as per specifications given by N.P.B.P (NAGAR PANCHAYAT BESA PIPLA). Yours Faithfully Agreed and Accepted by: SHAIJI INFRA PRO ·S PVT. LTD. ~~~tE---i :/B.ArCh. (Hons) . .1 t .ARCH/TECTS & INTERIOR DESIGNERS I Reg.N~.CN95118907 . NMC .LleNo.: R-90 . : ! rNIT LIeNo.: 865 t· ••• t... •••• , .j