FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 12/04/2026 To, KP DEVELOPERS AND BUILDERS THROUGH PARTNER SHRI, PRAMOD D. RAUT SHRI, KISHAN D. RAUT 152, Nari Bus Stop Nari Chowk, Nagpur-440026 Subject: Certificate of Percentage of Completion of Construction Work of KP NAGAR 1 having MahaRERA Registration Number P50500053055 being developed by KP DEVELOPES AND BUILDERS. This certificate is for the period ending 31 March 2026 Sir, I/ We PAWAN GUPTA ARCHITECTS have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of KP NAGAR 1 having MahaRERA Registration Number P50500053055 being developed by KP DEVELOPERS AND BUILDERS Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this certificate the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE - A Layout / Building/ Wing Number _____ (to be prepared separately for each Layout / Building / Wing of the Project) Sr Task / Activity Percentage of Actual No. (2) Work Done (As on (1) date of the Certificate) (3) 1. Excavation Not Applicable 2. Basements (if any) Not Applicable 3. Podiums (if any) Not Applicable 4. Plinth Not Applicable 5. Stilt Floor Not Applicable 6. Slabs of Super Structure Not Applicable 7. Internal walls, Internal Plaster, Floorings, Doors and Windows Not Applicable within Flats/Premises 8. Sanitary Fittings within the Flat/Premises Not Applicable 9. Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and Not Applicable Underground Water Tanks 10. External plumbing and external plaster, elevation, completion of Not Applicable terraces with waterproofing of the Building/Wing. 11. Installation of lifts, water pumps, Fire Fighting Fittings And Not Applicable Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building / Wing, Compound Wall and all other requirements as maybe required to complete project as per specifications in agreement of Sale. Any other activities. Note: Table A is not applicable to this project as it is project of plotted development (layout of Plots) and not construction of building Table B Common Areas (Internal and External Development Works) in respect to the Registered Phase / Project Number Sr.No Common areas Proposed Percentage of Details (1) and Facilities. (Yes/No) Work done (5) (2) (3) (As on date of the Certificate) (4) 1. InternalRoads& YES 90% Not Completed Footpaths 2. WaterSupply YES 100% Completed 3. Sewerage (chamber, lines, SepticTank, YES 95% Not Completed STP) 4. Storm Water Drains YES 100% Completed 5. Landscaping &Tree Planting YES 60% Not Completed 6. Street Lighting YES 50% Not Completed 7. Community Buildings NO 8. Treatment and disposal of sewage and NO sullage water 9. Solid Waste management & Disposal NO 10. Water conservation, Rain water YES 100% Completed harvesting 11. Energy management NO 12. Fire protection NO And fire safety requirements 13. Electrical meter room, sub-station, NO receiving station 14. Gardan Wall compound & path way , YES 100% Completed Gate Borwell & Water Connection Note : Entire Development work in the project is ongoing are as per specifications given by NMRDA ( Nagpur Metropolitan Regional Development Authority)