FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) For Quarter 01 of financial year 2024-2025 (01.04.2024 – 30.06.2024) Date: 03/10/2024 To, Shakti Builders and Developers Subject: Certificate of Percentage of Completion of Construction Work of Galaxy Park having MahaRERA Registration Number P50500052403 being developed by Shakti Builders and Developers. Sir, I/ We Lokesh W. Kadu have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of Galaxy Park having MahaRERA Registration Number P50500052403 being developed by Shakti Builders and Developers. Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this certificate the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE - A Layout / Building/ Wing Number _____ (to be prepared separately for each Layout / Building / Wing of the Project) Sr Task / Activity Percentage of Actual No. (2) Work Done (As on (1) date of the Certificate) (3) 1. Excavation 100% 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth NA 5. Stilt Floor NA 6. Slabs of Super Structure NA 7. Internal walls, Internal Plaster, Floorings, Doors and Windows NA within Flats/Premises 8. Sanitary Fittings within the Flat/Premises NA 9. Staircases, Lifts Wells and Lobbies at each Floor level, Overhead NA and Underground Water Tanks 10. External plumbing and external plaster, elevation, completion of NA terraces with waterproofing of the Building/Wing. 11. Installation of lifts, water pumps, Fire Fighting Fittings And NA Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building / Wing, Compound Wall and all other requirements as maybe required to complete project as per specifications in agreement of Sale. Any other activities. Table B Common Areas (Internal and External Development Works) in respect to the Registered Phase / Project Number Sr. Common areas Proposed Percentage of Details No and Facilities. (Yes/No) Work done (5) (1) (2) (3) (As on date of the Certificate) (4) 1. Internal Roads& Yes 100% Work completed Footpaths 2. Water Supply Yes 60% Work completed 3. Sewerage (chamber, lines, Yes 60% Work completed Septic Tank, STP) 4. Storm Water Drains Yes 60% Work completed 5. Landscaping & Tree Planting Yes 50% Work under Progress 6. Street Lighting Yes 100% Work completed 7. Community Buildings No NA NA 8. Treatment and disposal of Yes 50% Work under sewage and sullage water Progress 9. Solid Waste management & Yes 50% Work under Disposal Progress 10. Water conservation, Rain Yes 100% Work completed water harvesting 11. Energy management No NA NA 12. Fire protection No NA NA And fire safety requirements A13. Electrical meter room, sub- Yes 50% Work under station, receiving station Progress