Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date:06/01/2024 To, RKJ ESTATE PVT LTD NAGPUR, MAHARASHTRA, 440015 Subject : Certificate of percentage of Work of completion of construction work of ANANDAM 8 having MahaRERA Registration Number P50500052319 (Only Applicable after project Registartion) being developed by RKJ ESTATE PVT LTD Sir, I/We AR SARANG AGRAWAL have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of ANANDAM 8 having MahaRERA Registration Number P50500052319 (Only Applicable after project Registration, being developed by RKJ ESTATE PVT LTD ) Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. FOR QUARTER ENDING 31ST DECEMBER 2023 (QTR 3RD FY2023-2024) Table A Layout/Building/Wing Number: NA Plot Without Structure Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 2 Basements (if any) 3 Podiums (if any) 4 Plinth, 5 Stilt Floor 6 Slabs of Super Structure 7 Internal walls, Internal plaster, Floorings, Floors and windows within Flats/Premises 8 Sanitary Fitting within the Flat/Premises Page 1 of 3 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Page 2 of 3 Table B - Common Areas (Internal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities Is Available Percentage of Actual Details (Yes / No) Work Done (As on date of the Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & Footpaths Yes 72.00 AS PER SANCTIONED PLAN 2 Water Supply Yes 0.00 AS PER SANCTIONED PLAN 3 Sewerage (Chamber, Lines, Septic Tank , STP) Yes 22.00 AS PER SANCTIONED PLAN 4 Storm Water Drains Yes 12.00 AS PER SANCTIONED PLAN 5 Landscaping & Tree Planting No 0.00 NA 6 Street Lighting Yes 5.00 AS PER SANCTIONED PLAN 7 Community Buildings No 0.00 NA 8 Treatment And Disposal Of Sewage And Sullage Water Yes 0.00 AS PER SANCTIONED PLAN 9 Solid Waste Management And Disposal No 0.00 NA 10 Water conservation /Rain water harvesting No 0.00 NA 11 Energy managemcnt No 0.00 NA 12 Fire protection and fire safety requirements No 0.00 NA 13 Electrical meter room, sub-station, receiving station No 0.00 NA 14 Aggregate area of recreational Open Space Yes 25.00 AS PER SANCTIONED PLAN 15 Open Parking No 0.00 NA Yours Faithfully AR SARANG AGRAWAL Signature & Name (IN BLOCK LETTERS) of L.S/ Architect ( License No: CA/2009/43942) Date of Certificate:06/01/2024 Agreed and accepted by: Signature of Promoter Name: RKJ ESTATE PVT LTD Date:06/01/2024 Page 3 of 3