MAHALAXMI AEDIFICATORS PVT LIMITED adtou ol ust Date 27- o7-2023 DEVIATION REPORT WITH RESPECT TO ALLOTMENT LETTER No. To, Mr/Mrs./Ms.. R/o. (Address) Telephone/Mobile number Pan Card No: Aadhar Card No: Email ID: Sub: Your request for allotment of plot, 181/1/A AND 181/2/A in the project known as NAGAR-29), situated at MOUZA-VIHIRGAON, NAGPUR 441204, (MAHALAXMI No having MahaRERA Registration 0712-2295794 I+91 9850540601 N-103,104 Laxmivihar Apartment, Besides mahalaxmidevelopers14@gmail.com Hotel Airport Center point, Wardha Road, mahalaxmidevelopers,com Somalwada, Nagpur-440025 Sir/ Madam, 2. Allotment of parking space(s): Further, / we have the pleasure to inform veuthat youhave been allotted along with the said sq. mtrs unit, garage(s) bearing No(s) admeasuring level equivalent to sq ft/covered car parking space(s) at basement Ipodium bearing No(s) sq. admeasuring sq. mtrs. equivalent to ft/stilt parking bearing No(s) admeasuring sq. mtrs equivalent to Sq. ft Imechanical car parking unit bearing No(s) sq. mtrs. Equivalent admeasuring. enumerated in the to Sq. fit. on the terms and conditions as shall be agreement for sale to be entered into between ourselves and yourselves. OR 2. Allotment of open car parking : Further IWe have the pleasure to inform you that you have been allotted an open car parking bearing No. without consideration. with caveats as IWe have created the following encumbrance(s)/encumbrance(s) attached enumerated hereunder on the said unit. a) b Annexure-A Stage wise time schedule of completion of the project DATE OF SR. STAGES COMPLETETION NO. Excavation 2 Basements (if any) 3 Podiums (if any) 4 Plinth 5 Stilt (if any) 6 Slabs of super structure doors 7 Internal walls, internal plaster, completion of floorings, and windows the said units 8 Sanitary electrical and water supply fittings within level overhead Staircase, lifts wels and lobbies at each floor and underground water tanks elevation, completion of 10 External plumbing and external plaster, terraces with waterproofing. lifts, water pumps, fire fighting fittings and 11 Installation of electrical fittings, mechanical equipment, finishing equipment, protection, paving of areas to entrance lobbyls, plinth wall and all other appurtenant to building / wing, compound per requirements as may be required to complete project as specifications in agreement of sale, any other activities. 16 Treatment and disp0sal of sewage and sullage water 17 Solid waste management &disposal 18 Water conservation / 19 Electrical meter room, sub-station, receiving station. Note: -The Above points are deviated from model allotment Letter. Promoter (s)VAuthorjzed Signatory