FORM-2A [See Regulation 3A.] ENGINEERS'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at the end of Financial Year) Date: 15/04/2025 FOR YEAR ENDING 31ST MARCH 2025 (QTR. 4TH F.Y. 2024-2025) To, The DEOVRAT JAISWAL Nagpur (M Corp.), Nagpur (Urban), Nagpur, 440022 Quality Assurance Certificate (Certificate No. ......................for the Year Ending 31ST MARCH 2025) Subject : Certificate for quality of materials used and quality of Construction and workmanship of the work of 1-DEV HEIGHTS having MahaRERA Registration Number P50500051341 being developed by DEOVRAT JAISWAL Sir, I/We PRASHANT UPASANI have undertaken an assignment of supervision of this real estate project Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows : 1. Structural Design, Stability and Testing Sr. No. Parameters Yes/No Remarks 1 Whether soil investigations of the site has been Yes Soil investigation has been conducted conducted before the structural design and soil before the structural design and soil parameters have been accounted for in the parameters have been considered. structural design/drawings? 2 Whether Structural Engineer has been appointed for Yes Name: Mr. Ashwin Sonawane the project? License No: M-1682711 Mobile: 9096027889 E-mail: ashwinsonawane@gmail.com 3 Whether the inspection registers, site order book Yes Inspection registers, site order book, and and quality control test registers are maintained at quality control registers are properly the site properly and endorsed by the Engineer–in- maintained and endorsed. Charge? 4 Whether testing facilities to check quality of material No is available at site? Page 1 of 4 Sr. No. Parameters Yes/No Remarks 5 Whether the statuary provisions for disaster No resistance/earthquake resistant design have been incorporated, specially in case of multi-storeyed construction? 6 Has suitable cognizance been taken on demarcated No flood lines and appropriate precautions taken for protecting the site from flooding considering local flooding issues? 2. Input Materials Sr. No. Parameters Yes/No Remarks 1 Whether the following building materials confirm to Yes relevant IS/BS/NBC Code, or as per Industry Standards? If yes, provide details: (a) Cement, concrete and coarse aggregate Yes OPC/PPC cement (such as Ultratech. ACC, Ambuja) all Confirming to IS:456. Readv Mix Concrete (RMC) (b) Steel and its alloys Yes Fe 500/550 grade (such as Tata, JSW, or equivalent) as per IS:1786 (c) Electrical wire, fittings and accessories Yes Polycab, Havells) along with modular switches and MCBs confirming to IS:732 and IS:3043 (d) Plumbing and sanitary fittings Yes CPVC/UPVC (such as Astral, Supreme, Finolex) like Cera. Jaguar or equivalent conforming to IS:4985 and IS:13592. 2 Whether regular tests of materials and construction Yes GEOTECH LABS products are being done from accredited labs also? If yes, details of such labs 3 Whether manufacturer test certificate for cement, Yes Manufacturer's test certificates for steel, pipes etc. have been obtained and whether cement, steel, pipes, etc., are obtained supply records are being maintained? and supply records maintained. 4 Whether suitable water is being used for Yes construction? (i) What is the source of water? Yes CORPOARTION WATER SHALL BE PROVIDED (ii) Has water been tested and approved by Yes Engineer-in-Charge before construction? (iii) Has water been tested subsequently as per Yes requirement? 3. Quality of Workmanship Sr. No. Parameters Yes/No Remarks 1 Whether works of all the electrical Yes Electrical works including wiring, lift wiring/connections/lift installation/other electrical installations, etc., carried out by installations have been carried out under authorized electrical engineers with authorized/registered electrical engineer and records maintained. whether records of the same has been maintained? 2 Whether all related works of plumbing & sanitary Yes All works are under supervision of skilled including installation of water supply systems, professionals, and workmanship/quality is drainage systems, sewage systems, sinks, toilets satisfactory within permissible limits. etc. have been carried out under authorized/registered plumbers/sanitary contractors and whether records of the same has been maintained? Page 2 of 4 Sr. No. Parameters Yes/No Remarks 3 Whether all the work is being carried out under Yes All works are under supervision of skilled supervision of experienced and skilled professional? professionals, and workmanship/quality is Further, whether the workmanship and quality is satisfactory within permissible limits. satisfactory and up to the mark and the work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? 4 Whether remedial measures are undertaken to Yes Remedial measures against dampness prevent dampness and leakages? If yes, provide and leakage undertaken - Dr. Fixit K2 details Crete used. 5 Whether safety precautions are undertaken during No construction activities for all type of workers? 4. Miscellaneous Sr. No. Parameters Yes/No No 1 Whether third party quality inspection is being No carried out on site during/after completion of the works? If yes, provide details. 2 Whether anti-termite treatment has been undertaken Yes Anti-termite treatment for the soil has for the soil? been duly carried out in accordance with the approved specifications 3 Whether fire-fighting arrangements has been Yes Licensed Fire Safety Consultant and Fire undertaken under supervision of fire consultant? Protection Engineer are hired. 4 Whether proper signages have been installed on No site/completed building as per requirement? 5 Whether precautions are undertaken to avoid air Yes GREEN NETS HAS BEEN USED pollution during construction? Please specify. 6 Whether records of all test reports/results have been Yes The records of all test reports and results properly kept in the prescribed formats and whether appear to have been maintained. the same are available at site for viewing by allottees and to be handed over to the association of allottees? 7 Whether all relevant records including sanctioned Yes All relevant records including sanctioned building plans, utility drawings, various test plans, utility drawings, test reports are reports/results have been properly kept in the properly kept and will be handed over to prescribed formats to be handed over to the the association of allottees. association of allottees? 8 Any innovative/cost effective/green technology has Yes RAINWATER HARVESTING been used for improving quality/energy efficiency? Please specify. Yours Faithfully Signature of Engineer (Site Supervisor) Agreed and accepted by Name: PRASHANT UPASANI Qualification (Not less than graduate) License No. (if any): NA Phone No: Signature of Promoter Name: Place: DEOVRAT JAISWAL Date: 15/04/2025 Page 3 of 4