DESIGN Arc�ilccture Planning & FORM 1 Interiors [See Regulation 3] ARCHITECT'S CERTIFICATE Date: 03/01/2024 For Quarter Ending 31st December 2023 (Qtr. 3rd F.Y 2023-2024) To, Deovrat Sanjay Jru.swa1 A-503, Shewalkar Gardens South Ambazari Road, Gopal Nagar, Near Vnit Gate, Nagpur - 440022 Subject: Cerlilicale Of Percentage Of Completion Of Construction Work Of 1- 0cv Heighls Having Maharci-a Registration No. P5050005134I Being Developed By Deovrat Sanjay Jaiswal. Sir, I/ We Emanate Design (Architect Lokesh Kadu) Have Undertaken Assignment As Architect /Licensed Smveyor Of Certifying Percentage Of Completion Of Construction Work Of 1-Dev Heights, Having Maharera Registration No. P50500051341 Being Developed By Deovrat Sanjay Jaiswal. Based On Site Inspection, With Respect To The Building Of The Aforesaid Real Estate Project , I Certify That As On The Date Of This Certificate, The Percentage or Work Done For The Building Of The Real Estate Project Under Maharcra Is As Per Table A Herein Below. The Percentage Of The Work Executed With Respecl To Each Of The Activity Of The Entire Phase Is Detailed In Table B. Blor� No ii, 11A, 12, 3rd Fluor 1\-Wmg (J.B Wing!. Manqalwan Complex. Sadar, Nagpur t.itOOOi 9823872384, 7776381,?38 emanatcdes1qn9·c1r1111�•I r.om www.ema11utedes1gn.in Table A Building Number 1-DEV HElGHTS Sr. Tasks / Activity Percentage No of work done 1 Excavation 100% 2 Basements (if any) Nil 3 Podiums (if any) Nil 4 Plinth 100% 5 Stilt Floor 50% 6 Slabs of Super Structure 0% 7 Internal walls, Internal Plaster, Floorings, Doors and 0% Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises 0% 9 Staircases, Lifts Wells and Lobbies at each Floor level, 0% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of tenaces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finisrung to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. Ar. LOKESH KAD\J CA/'2007 i3938 'f NMCR-�02, NIT:-4J40 TABLE-B Common Areas (Internal & External Development Works) in Respect of the entire Registered Phase / Project Number S.No. Common areas and Propos Percentage of Details Facilities, Amenities ed Actual Work (Yes/N done o) (As on date of the certificate) 1 Internal Roads & Footpaths No 0 Na 2. Water Supply Yes 0% Borewell/ Corpoation Water Shall Be Provided 3. Sewerage (chamber, lines, Yes 0% As Per Septic Tank , STP) Sanctioned Plan 4. Storm Water Drains Yes 0% As Per Sanctionedpla n 5. Landscaping & Tree Planting Yes 0% As Per Sanctionedpla n 6. Street Lighting No 0 Na 7. Community Buildings No 0 Na 8. Treatment and disposal of No 0 Na sewage and sullage water 9. Solid Waste management & No 0 Na Disposal 10. Water conservation/ Rain Yes 0% As Per water harvesting Sanctioned \ 4� �aiy ·" ... LOKESH KAO u CAi20C 7/J9381 11. Energy management I No 0 I Na 12. Fire protection and fire safety Yes 0% As Per Requirernenl Sanctioned Plan 13. Electrical meter room, sub- Yes 0% Meter Pannel station, receiving station Shall Be Provided Yours Failhfully Emanate Design (Architect Lokesh Kadu) Name of Architect & Signature Ll, ·.�AD u __ .... -. .... •· ·cA,..:402 0011393a 1 , NIT-2140 NMCR- Agreed and Accepted by: Signature of Promoter Dcovrat Sanjay Jaiswal Place: Nagpur Date:- 03/01/2024