DESIGN Architecture Planning & FORM 1 Inte r i o r s [See Regulation 3] ARCHITECT'S CERTIFICATE Date: 07/07/2023 For Quarter Ending 30th June 2023 (Qtr. 1st F.Y 2023-2024) To, DEOVRAT SANJAY JAISWAL A-503, SHEWALKAR GARDENS SOUTH AMBAZARI ROAD, GOPAL NAGAR, NEAR VNIT GATE, NAGPUR - 440022 Subject: Certificate of Percentage of Completion of Construction Work of 1- DEV HEIGHTS having MahaRERA Registration no. P50500051341 being developed by DEOVRAT SANJAY JAISWAL. Sir, I/ We Ema.nate Design (Architect Lokesh Kadu) have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of 1-0EV HEIGHTS, having MahaRERA Registration no. P50500051341 being developed by DEOVRAT SANJAY JAISWAL. Based on Site Inspection, with respect to the Building of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for the building of the Real Estate Project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Block No. 11, 11A, 12, 3rd Floor, A-Wing (J.B Wing), Mangalwari Complex. Sadar, Nagpur - 440001 I 9823872384, 7276384238 emanatedes1gn9@gmall.com I www.emanatedes1gn.in Table A Building Number 1-DEV HEIGHTS Sr. Tasks / Activity Percentage No of work done 1 Excavation 75% 2 Basements (if any) Nil 3 Podiums (if any) Nil 4 Plinth 0% 5 Stilt Floor 0% 6 Slabs of Super Structure 0% 7 Internal walls, Internal Plaster, Floorings, Doors and 0% Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises 0% 9 Staircases, Lifts Wells and Lobbies at each Floor level, 0% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. � r. LOKESH KADU CPJ2007/39381 NMC�-402, NIT-2140 TABLE-B Common Areas (Internal & External Development Works) in Respect of the entire Registered Phase / Project Number S.No. Common areas and Propos Percentage of Details Facilities, Amenities ed Actual Work (Yes/N done o) (As on date of the certificate) 1 Internal Roads & Footpaths No 0 NA 2. Water Supply Yes 0% NMCWATER AFI'EROC 3. Sewerage (chamber, lines, Yes 0% AS PER PLAN Septic Tank , STP) 4. StormWater Drains Yes 0% AS PER PLAN 5. Landscaping & Tree Planting Yes 0% AS PER PLAN 6. Street Lighting No 0 NA 7. Community Buildings No 0 NA 8. Treatment and disposal of No 0 NA sewage and sullage water 9. SolidWaste management & No 0 NA Disposal 10. Water conservation/ Rain Yes 0% AS PER PLAN water harvesting 11. Energy management Yes 0% AS PER PLAN 12. Fire protection and fire safety YES 0% AS PER PLAN Requirement 13. Electrical meter room, sub- Yes 0% AS PER PLAN station, receiving station /, /. "/47/ Ar. LOKESH KADU CA/2007/39381 11nt ·"' 402, NIT-214 0 Architect Lokesh Kadu Name of Architect & Signature Agreed and Accepted by: Signature of Promoter DEOVRAT SANJAY JAISWAL Place: Nagpur Date:- 07/07/2023 'Ar. LOKESH KADU CA/2007/39381 NMCR•402, NIT-21.40