FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE Date: 10/07/2025 To, Deovrat Sanjay Jaiswal A-503, Shewalkar Gardens South Ambazari Road, Gopal Nagar, Near Vnit Gate, Nagpur - 440022 Subject: Certificate Of Percentage Of Completion Of Construction Work Of 1- Dev Heights Having Maharera Registration No. P50500051341 Being Developed By Deovrat Sanjay Jaiswal. Sir, I/ We Emanate Design (Architect Lokesh Kadu) Have Undertaken Assignment As Architect /Licensed Surveyor Of Certifying Percentage Of Completion Of Construction Work Of 1-Dev Heights, Having Maharera Registration No. P50500051341 Being Developed By Deovrat Sanjay Jaiswal. Based On Site Inspection, With Respect To The Building Of The Aforesaid Real Estate Project, I Certify That As On The Date Of This Certificate, The Percentage Of Work Done For The Building Of The Real Estate Project Under Maharera Is As Per Table A Herein Below. The Percentage Of The Work Executed With Respect To Each Of The Activity Of The Entire Phase Is Detailed In Table B. Table A Building Number 1-DEV HEIGHTS Sr. Tasks /Activity Percentage No of work done 1 Excavation 100% 2 Basements (if any) Nil 3 Podiums (if any) Nil 4 Plinth 100% 5 Stilt Floor 100% 6 Slabs of Super Structure 100% 7 Internal walls, Internal Plaster, Floorings, Doors and 79% Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises 40% 9 Staircases, Lifts Wells and Lobbies at each Floor level, 43% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. TABLE-B Common Areas (Internal & External Development Works) in Respect of the entire Registered Phase / Project Number S.No. Common areas and Propos Percentage of Details Facilities, Amenities ed Actual Work (Yes/N done o) (As on date of the certificate) 1 Internal Roads & Footpaths No 0 Na 2. Water Supply Yes 34% Corporation Water Shall Be Provided 3. Sewerage (chamber, lines, Yes 78% As Per Septic Tank, STP) Sanctioned Plan 4. Storm Water Drains Yes 25% As Per Sanctioned plan 5. Landscaping & Tree Planting Yes 0% As Per Sanctioned plan 6. Street Lighting No 0 Na 7. Community Buildings No 0 Na 8. Treatment and disposal of No 0 Na sewage and sullage water 9. Solid Waste management & No 0 Na Disposal 10. Water conservation/ Rain Yes 0% As Per water harvesting Sanctioned plan 11. Energy management No 0 Na 12. Fire protection and fire safety Yes 0% As Per Requirement Sanctioned Plan 13. Electrical meter room, sub- Yes 12% Meter Pannel station, receiving station Shall Be Provided Yours Faithfully Emanate Design (Architect Lokesh Kadu) Name of Architect & Signature Agreed and Accepted by: Signature of Promoter Deovrat Sanjay Jaiswal Place: Nagpur Date:- 10/07/2025