DESIGN Architecture Planning & FORM 1 lnteriors [See Regulation 3] ARCHITECT'S CERTIFICATE Date: 07 l07l2023 To, DEOVRAT SANJAY JAISWAL A-503, SHEWALKAR GARDENS SOUTH AMBAZARI ROAD, GOPAL NAGAR, NEAR VNIT GATE, NAGPUR - 44OO22 Subject: Certilicate of Percentage of Completion of Construction Work of 1- DEV HEIGHTS having MahaRERA Registration no. P50500051341 being developed by DEOVRAT SANJAY JAISIIIAL. Sir, r/ We Emanate (Architect Kadul have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of construction work of I-DEV HEIGHTS, having MahaRERA Registration no. P50500051341 being developed by DEOVRAT sANJAy JAISWAL. Based on Site Inspection, with respect to the Building of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the percentage of Work done for the building of the ReaI Estate Project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Block No. ll, 11A, 12, 3rd Floor, A-Wing {J.B Wing} I'langalwari Complex, Sadar, Nagpur-440001 I g823872JB4,7Z763BqZSg i emanatedesigng@gmail.com I www.emanatedesign.in Table A Building Number I-DEV HEIGHTS Sr. Tasks /Activity Percentage No of work done 1 Excavation 75o/" 2 Basements (if any) Nil 3 Podiums (if any) Nil 4 Plinth Oo/o 5 Stilt Floor O"/" 6 Slabs of Super Structure O"/" 7 Internal walls, Internal Plaster, Floorings, Doors and Oo/o Windows within FIat/ Premises 8 Sanitary Fittings within the Flat/Premises Oo/o 9 Staircases, Lifts Wells and Lobbies at each Floor level, Oo/o Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, Oo/o completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and Oo/o Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. \ r. I-CKESH KADU i:A,12.807139381 N l'4CrT-402, Nl lT-21 40 TABLE-B Common Areas (Internal & External Development Works) in Respect of the entire Registered Phase / Project Number S.No Common areas and Propos Percentage of Details Facilities, Amenities ed Actual lllork (Yes/N done o) (As on date of the certificate) 1 Internal Roads & Footpaths No o NA 2 Water Supply Yes o% NMC WATER AFTER OC 3 Sewerage (chamber, lines, Yes o.h AS PER PLAN Septic Tank , STP) 4 Storm Water Drains Yes Oo/o AS PER PLAN 5 Landscaping & Tree Planting Yes Oo/o AS PER PLAN 6 Street Lighting No 0 NA 7 Community Buildings No 0 NA 8 Treatment and disposal of No o NA sewage and sullage water 9 Solid Waste management & No 0 NA Disposal 10 Water conservation/ Rain Yes Oo/o AS PER PLAN water harvesting 11. Energr management Yes Oo/o AS PER PLAN t2. Fire protection and fire safetY YES ooh AS PE,R PLAN Requirement 13 Electrical meter room, sub- Yes Oo/o AS PER PLAN station, receiving station ,/ ,. Ar. LOKESH KADU ON2007/39381 f,l' 2, hllT-?I 40 Yours Faithfully Name of Architect & Signature Agreed and Accepted by: Signature of Promoter DEOVRAT SANJAY JAISWAL Place: Nagpur Date:- 07 /O7 /2023