ANNEXEURE A FORM 1 (SEE REGULATION3) ARCHITECT’S CERTIFICATE (FOR THE QUARTER ENDED 30th JUNE 2025 URANUS APARTMENT– Project Registration No. P50500052289 Date: 20th August 2025 To, M/s. Dhuni Constructions Pvt. Ltd. FS – 11, 1st Floor, Building No. 1, Vidharbha Premium, Opp. Gandhisagar Lake, Nagpur – 440018. Subject: Certificate of percentage of Completion of Construction Work of “URANUS APARTMENT” of the Project Registration No. P50500052289, situated on the Plot bearing C.N. No./CTS No./ Survey no./Final Plot No. 5,6,7,8,9, C.T.S. No. 154, Kh. No. 19/1Ja, 19/1Kha, 20/1Kha, demarcated by its boundaries (latitude and longitude of the end points) Other Layout to the North, 9 Mtrs Wide Road to the South, Plot No. 4 and Plot No. 6 to the East, Plot No. 7 and 9 to the West, of Mouza - Sonegaon, Taluka – Nagpur, District – Nagpur, PIN – 440022, admeasuring 2198.86 sq. mts. area being developed by M/s. Dhuni Constructions Pvt. Ltd. Sir, I/We _________Ar. Swapnil Gode_________, have undersigned assignment as Architect/Licensed Surveyor of certifying percentage of completion of construction work of “URANUS APARTMENT” of the Project Registration No. P50500052289, situated on the Plot bearing C.N. No./CTS No./ Survey no./Final Plot No. 5,6,7,8,9, C.T.S. No. 154, Kh. No. 19/1Ja, 19/1Kha, 20/1Kha, demarcated by its boundaries (latitude and longitude of the end points) Other Layout to the North, 9 Mtrs Wide Road to the South, Plot No. 4 and Plot No. 6 to the East, Plot No. 7 and 9 to the West, of Mouza - Sonegaon, Taluka – Nagpur, District – Nagpur, PIN – 440022, admeasuring 2198.86 sq. mts. area being developed by M/s. Dhuni Constructions Pvt. Ltd. Based on site inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project. I certify that as on date of this certificate, the percentage of work done for each of Building/Wing of the Real Estate Project under MahaRERA Page 1 of 4 is as per TABLE A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in TABLE B. TABLE A URANUS APARTMENT Sr Task / Activity Percentage of Actual No. (2) Work Done (As on date (1) of the Certificate) (3) 1 Excavation 100% 2 Basement (if any) 100% 3 Podium (if any) - 4 Plinth 100% 5 Stilt Floor - 6 Slab of Super Structure 100% 7 Internal Wall, Internal Plaster, Flooring, Doors 100% & windows within Flats & Premises 8 Sanitary Fitting with Flat & Premises 100% 9 Staircase, Lifts Wells and Lobbies at each floor 100% level Overhead and Underground Water Tanks. 10 External Plumbing and External Plaster 100% elevation completion of terraces and waterproofing of the Building Wings. 11 Installation of lifts, water pumps, fire fighting 100% fitting and equipments as per CFO NOC Electrical Fitting, Mechanical equipments, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby, plinth protection paying of area appurtenant to Building Wings. Compound wall and all other requirements as may be required to complete project as per specification in agreement of Sale. Any other activities Page 2 of 4 TABLE B Common Area (Internal & External Development Works) in respect of URANUS APARTMENT– Project Registration No. P50500052289 Sr. Common Area & Proposed Percentage of Details No. Facilities Yes/No Actual Work (5) (1) (2) (3) Done (As on date of the Certificate) (4) 1 Internal Road & Foot NO NA Na path 2 Water Supply YES 100% Work Completed 3 Sewerage (Chamber YES 100% Work Completed Lines, Septic Tanks, STP) 4 Storm Water Drains NO NA Na 5 Landscaping and Tree YES 100% Work Completed Planting 6 Street Lighting NO NA Na 7 Community Building NO NA Na 8 Treatment and NO NA Na Disposal of sewage and sullage water 9 Solid waste NO NA Na management & disposal 10 Water Conservation/ YES 100% Work Completed Rain Water Harvesting 11 Energy Management NO NA NA 12 Fire protection and fire NO NA NA safety requirements 13 Electrical meter room, YES 100% Work Completed sub-station, receiving station 14 Other (Option to Add NA NA NA More) Page 3 of 4 Yours Faithfully, Signature & Name __________________________________OF L.S./ Architect (License No………………..) Agree and Accepted Signature of Promoter Name: M/s. Dhuni Constructions Pvt. Ltd. Date: 20th August 2025 Place: Nagpur Page 4 of 4