STU�IO ARCHITECTS •NAGPUR •BENGALURU •RAIPUR FORM 1 [See Regulation 3) ARCHITECT'S CERTIFICATE Date: 05/07/2025 To, R SANDESH CONSTRUCTION HOUSE NO. 897, SHIV NARAYAN BHAWAN, P S AGRAWAL MARG, SANTRA MARKET, NAGPUR-440018 Subject: Certificate of Percentage of Completion of Construction Work of THE VIEW having MahaRERA Registration no. P50500052261 being developed by R SANDESH CONSTRUCTION NAGPUR. Sir, I/ We Ar. PRANAV LAKHOTIYA have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of THE VIVE, having MahaRERA Registration no. P50500052261 being developed by R SANDESH CONSTRUCTION NAGPUR. Based on Site Inspection, with respect to the Building of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for the building of the Real Estate Project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. 105, Haakim Arcade, Coffee House Square, Dharampeth, Nagpur-440 010. (M.S.) Tel: +9l-9890918332, +91-9890918344. E-mail: d.studio3@yahoo.in Table A Building Number THE VIEW Sr. Tasks / Activity Percentage No of work done 1 Excavation 100% 2 Basements 100% 3 Podiums (if any) Nil 4 Plinth 100% 5 Stilt Floor 100% 6 Slabs of Super Structure 85% 7 Internal walls, Internal Plaster, Floorings, Doors and 32% Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises 0% 9 Staircases, Lifts Wells and Lobbies at each Floor level, 52% Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing 11 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any Other Activities. TABLE-B Common Areas (Internal & External Development Works) in Respect of the entire Registered Phase/ Project Number S.No. Common areas and Propos Percentage of Details Facilities, Amenities ed Actual Work (Yes/N done o) (As on date of the certificate) 1 Internal Roads & Footpaths No 0 NA 2. Water Supply Yes 18% Borewell/ Corporation Water Shall Be Provided 3. Sewerage (chamber, lines, Yes 42% As Per Sanctioned Plan Septic Tank , STP) 4. Storm Water Drains Yes 28% As Per Sanctioned Plan 5. Landscaping & Tree Planting Yes 0% As Per Sanctioned Plan 6. Street Lighting No 0 NA 7. Community Buildings No 0 NA 8. Treatment and disposal of No 0 NA sewage and sullage water 9. Solid Waste management & No 0 NA Disposal 10. Water conservation/ Rain Yes 20% As Per water harvesting Sanctioned Plan 11. Energy management No 0 NA 12. Fire protection and fire safety Yes 0% As Per Requirement Sanctioned Plan 13. Electrical meter room, sub- Yes 5% Meter Pannel station, receiving station shall be provided 14. Aggregate area of recreational No 0 NA Open Space 15. Open Parking No 0 NA Ar. PRANAV LAKHOTIYA Name of Architect & Signature Agreed and Accepted by: Rakesh Omprakash Hemrajani Partner R SANDESH CONSTRUCTION Date:- 05/07/2025