FORM-2A [See Regulation 3A.] ENGINEERS'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at the end of Financial Year) Date:12-03-2026 To, The Gopal Kapuriya, Archana Jakhotia, Leelabai Chandak, Abhishek Chandak, Manisha Taori, Katol (M Cl), Katol, Nagpur, 441302 Quality Assurance Certificate (Certificate No. 00197 2025-2026 ......................for the Year Ending .......................) Subject : Certificate for quality of materials used and quality of Construction and workmanship of the work of Vrindavan Vihar having MahaRERA Registration Number P50500052309 being developed by Gopal Kapuriya, Archana Jakhotia, Leelabai Chandak, Abhishek Chandak, Manisha Taori, Sir, I/We ...................... have undertaken an assignment of supervision of this real estate project Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows : 1. Structural Design, Stability and Testing Sr. No. Parameters Yes/No Remarks 1 Whether soil investigations of the site has been No conducted before the structural design and soil parameters have been accounted for in the structural design/drawings? 2 Whether Structural Engineer has been appointed for No the project? 3 Whether the inspection registers, site order book No and quality control test registers are maintained at the site properly and endorsed by the Engineer–in- Charge? 4 Whether testing facilities to check quality of material No is available at site? Page 1 of 3 Sr. No. Parameters Yes/No Remarks 5 Whether the statuary provisions for disaster No resistance/earthquake resistant design have been incorporated, specially in case of multi-storeyed construction? 6 Has suitable cognizance been taken on demarcated No flood lines and appropriate precautions taken for protecting the site from flooding considering local flooding issues? 2. Input Materials Sr. No. Parameters Yes/No Remarks 1 Whether the following building materials confirm to Yes relevant IS/BS/NBC Code, or as per Industry Standards? If yes, provide details: (a) Cement, concrete and coarse aggregate Yes (b) Steel and its alloys No (c) Electrical wire, fittings and accessories No (d) Plumbing and sanitary fittings No 2 Whether regular tests of materials and construction No products are being done from accredited labs also? If yes, details of such labs 3 Whether manufacturer test certificate for cement, No steel, pipes etc. have been obtained and whether supply records are being maintained? 4 Whether suitable water is being used for Yes construction? (i) What is the source of water? Yes (ii) Has water been tested and approved by No Engineer-in-Charge before construction? (iii) Has water been tested subsequently as per No requirement? 3. Quality of Workmanship Sr. No. Parameters Yes/No Remarks 1 Whether works of all the electrical No wiring/connections/lift installation/other electrical installations have been carried out under authorized/registered electrical engineer and whether records of the same has been maintained? 2 Whether all related works of plumbing & sanitary No including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized/registered plumbers/sanitary contractors and whether records of the same has been maintained? 3 Whether all the work is being carried out under Yes supervision of experienced and skilled professional? Further, whether the workmanship and quality is satisfactory and up to the mark and the work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? Page 2 of 3 Sr. No. Parameters Yes/No Remarks 4 Whether remedial measures are undertaken to No prevent dampness and leakages? If yes, provide details 5 Whether safety precautions are undertaken during Yes construction activities for all type of workers? 4. Miscellaneous Sr. No. Parameters Yes/No No 1 Whether third party quality inspection is being No carried out on site during/after completion of the works? If yes, provide details. 2 Whether anti-termite treatment has been undertaken No for the soil? 3 Whether fire-fighting arrangements has been No undertaken under supervision of fire consultant? 4 Whether proper signages have been installed on No site/completed building as per requirement? 5 Whether precautions are undertaken to avoid air Yes pollution during construction? Please specify. 6 Whether records of all test reports/results have been No properly kept in the prescribed formats and whether the same are available at site for viewing by allottees and to be handed over to the association of allottees? 7 Whether all relevant records including sanctioned No building plans, utility drawings, various test reports/results have been properly kept in the prescribed formats to be handed over to the association of allottees? 8 Any innovative/cost effective/green technology has No been used for improving quality/energy efficiency? Please specify. Yours Faithfully Signature of Engineer (Site Supervisor) Name: Vaibhav Khadse Qualification (Not less than graduate) License No. (if any): Phone No: Place: Agreed and accepted by Signature of Promoter Name: Gopal Kapuriya, Archana Jakhotia, Leelabai Chandak, Abhishek Chandak, Manisha Taori, Date: Page 3 of 3