FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE Date: llllOl2024 To, Global logistic Park Plot No. 32, Central Avenue Road' Tahsil Police Station, Nagpur-44 1204 Subject:CertificateofPercentageofCompletionofConstructionWorko[ BHAKTIPARK-3havingMahaRERARegistrationno.PSoSoooS23oSbeing developed by M/s Global Logistic Park Nagpur' Sir, IArchitectSamirSandehaveundertakenassignmentasArchitect /LicensedSurveyorofcertifyingPercentageofCompletionofConstruction WorkofBHAKTIPARK.3,having.MahaRERARegistrationno. P5O5OOO523O8 being developed by M/s Global Logistic Park Nagpur' BasedonSitelnspection,withrespecttotheBuildingoftheaforesaidReal EstateProject,Icertifythatasonthedateofthiscertificate,thePercentage is Real Estate Project under MahaRERA of work done for the building of the aSpertableAhereinbelow.Thepercentageoftheworkexecutedwith respecttoeachoftheactivityoftheentirephaseisdetailedinTableB. Table A Building BHAKTI PARK 3 Percentage Tasks /ActivitY of Sr. work done No NA 1 Excavation NA 2 Basements (if anY) NA 3 Podiums (if any) NA 4 Plinth NA 5 Stilt Floor NA 6 Slabs of SuPer Structure NA Doors and 7 Internal walls, In ternal Plaster, Floorings, Windows within Flat/Premises NA S anitary Fi ttings within the Flat I Premises 8 NA Lobbies a t each Floor level, 9 Staircases, Lifts W ells and Water Tanks Overhead and Underground elevation, NA external plaster, 10 External plumbing and with waterProofing of the comPletion of terraces Building/Wing NA Fire Figh ting Fittin gs and 11 Installation of lifts, wa ter pu mps' Electrical fittings, mechanical Equi pmen t AS per CFO NO C of environ ment CRZ equipmen t, Com pliance to conditions Io b by S plinth protection NO C finishing to entrance Building Wing, Com pound paving of areas appurtenan t to AS may be required to w all and all other requiremen tS tion 1n agreemen t of S ale complete project AS per specifica Any Other Activities TABLE-B CommonAreas(Internal&ExternalDevelopmentWorks)inRespectof the entire Registered Phase / Project Number Proposed Percentage Details S.No. Common areas and Facilities, Amenities (Yes/No) of Actual Work done (As on date of the certificate) Yes 780h As per 1 Internal Roads & Footpaths Sanctioned Layout Plan Yes 45o/o As per 2 Water SuPPIY Sanctioned Layout Plan Yes 55o/o As per 3 S"*erag" (chamber, lines, Sanctioned Septic Tank, STP) Layout Plan Yes 48o/o As per 4 Storm Water Drains Sanctioned Layout Plan Yes Oo/o As per 5 LandscaPing & Tree Sanctioned Planting Layout Plan Yes 700h As per 6 Street Lighting Sanctioned Layout Plan No 0 NA 7 CommunitY Buildings 0 NA 8 Treatment and disposal of No sewage and sullage water Solid Waste managemen t& No 0 NA 9 Disposal Yes 28o/o As Per 10 Water con servation/ Rain Sanctioned water harvesting Layout Plan No 0 NA 11 Energr managemen t No 0 NA t2 Fire protection and fire safety Requirement No 0 NA 13. Electrical meter room' su b- station, receiving station No 0 NA 14. Aggregate area of recreational OPen SPace Yours FaithfullY M Architect Samir Sande Name of Architect & Signature Agreed and AccePted bY: \ Agrawal Partner Global logistic Park Date: 17 / lO 12024