FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 06/01/2024 To, M/S PSP REALTY Anandam world city, Model Mill compound, Near ST stand' Ganeshpeth' Nagpur- 440018 Subject: Certificate of Percentage of Completion of Construction Work of MAULI TOWN -19 (SEC-B) for the period October 2023- December 2023 having Maha RERA Registration Number P50500052271 (Only Applicable after project registration) being developed by M/S PSP REALTY. Sir, I/ We Mr. Pawan Gupta, have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of MAULI TOWN -19 (SEC-B) having Maha RERA Registration Number P50500052271 (Only Applicable after project registration) being developed by M/S PSP REALTY. Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this certificate the Percentage of Work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE - A Layout / Building/ Wing Number _____ (to be prepared separately for each Layout / Building / Wing of the Project) Sr Task / Activity Percentage of No. (2) Actual Work Done (1) (As on date of the Certificate) (3) 1. Excavation NA 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth NA 5. Stilt Floor NA 6. Slabs of Super Structure 7. Internal walls, Internal Plaster, Floorings, Doors and NA Windows within Flats/Premises 8. Sanitary Fittings within the Flat/Premises NA 9. Staircases, Lifts Wells and Lobbies at each Floor level, NA Overhead and Underground Water Tanks 10. External plumbing and external plaster, elevation, NA completion of terraces with waterproofing of the Building/Wing. 11. Installation of lifts, water pumps, Fire Fighting Fittings NA And Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building / Wing, Compound Wall and all other requirements as maybe required to complete project as per specifications in agreement of Sale. Any other activities. Table B Common Areas (Internal and External Development Works) in respect to the Registered Phase / Project Number Sr.No Common areas Proposed Percentage of Details (1) and Facilities. (Yes/No) Work done (5) (2) (3) (As on date of the Certificate) (4) 1. Internal Roads & YES 90 % Under Process Footpaths 2. Water Supply YES 90 % Under Process 3. Sewerage (chamber, lines, YES 90 % Under Process Septic Tank, STP) 4. Storm Water Drains YES 90 % Under Process 5. Landscaping &Tree Planting YES 90 % Under Process 6. Street Lighting 90 % YES Under Process 7. Community Buildings NA NA NA 8. Treatment and disposal of YES 90 % Under Process sewage and sullage water 9. Solid Waste management & NA NA NA Disposal 10. Water conservation, Rain YES 90 % Under Process water harvesting 11. Energy management NA NA NA 12. Fire protection NA NA NA And fire safety requirements 13. Electrical meter room, sub- YES 90 % Under Process station, receiving station 14. Others (Option to Add more) NA NA NA