Annexure A Form 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date- 02/10/2023 To The Mrs. Vrinda Wio Hemant Deshmukh Through P.O.A Shreekrishna Infraventure Partners, Plot No.167 Indraprastha Nagar, Nagpur. Subject Certificate of Percentage of Completion of Construction Work of "Shreekrishna Pride" having MahaRERA registration Number P50500051319 (only applicable after project registration) being developed by Shreekrishna Infraventure Partners. S1r /We Rupesh Rangari have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of constructionWork of "ShreeKrishna Pride"having MahaRERA Registration Number P50500051319 (oniy Application after project Registration, being developed by Shreekrishna Infraventure Partners. Based on Site Inspection with respect to layout /each of the Building Wing of the aforesaid Real Estate Project certify that as on the date of this certificate the Percentage of work done for each of the building Wing of the Real Estate Project under MahaRERA is as per Table Aherein below. The percentage of work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE -A Layout / Building Wing Number (to be prepared separately for each Layout /BuildingWing of the Project) Sr.No Task/ Activity Percentage of actual work Done (1) 2 (as on date of the certificate) (3 1 Excavation Completed. Basement (if any) N.A 3 Podium (if any) N.A Plinth Completed. Stilt Floor Completed. R.C.C Slabs of Ground,Ist, VIlth Slabs of Super Structure lind, lIrd, IVth,Vth, VIth & Floor Completed. and windows within Brick Masonry of Ist, lInd., Internal walls. Internal Plaster Floorings Doors llrd, IVth, Vth & VIth Floor Flat/ Premises Completed. Sanitary Fitting within the Flat/Premises Overhead and Staircase,lifts wells and Lobbies at each Floor level Underground Water Tanks completionof 10 External plumbing and external plaster,elevation , terraces with waterproofing of the building / wings. equipment as 11 Installation of lifts, water pumps, Fire Fighting Fitting and compliances per CFO NOC, electrical fittings, mechanical equipment, Finishing toentrance lobby/s, to condition of environment /CRZ NOC, appurtenant to Building /Wing. plinth projection, paving of area may be required to Compound wall and all other requirement as Complete project as per specificationin agreement of sale . Any other activities TABLE -B )in respect of the Registration Phasel Project Common area( Internal and External Development Works Number Percentage of actual work Details Common areas and Facilities Proposed Sr No (Yes/ No) done (As on date of the (5 (1) (2) certificate ) (3 (4) 1 Internal Roads & Footpath 2 Water Supply 3 Sewerage ( chamber, lines Septic Tank, STP) 4 Storm water Drains 5 Landscaping &Tree Plating 6 Street Lighting 7 Community Building 8 Treatment and disposal of sewage and sulage water Solidwaste management &disposal 10 Water conservation/ Rain water harvesting Energy management 12 Fire protection and fire safety requirements 13 Electrical meter room, sub -station, receiving station 14 Other (option to Add more) RUPESHRANGARI Architect, Alanner &Designer Suman Vihar, 1148, New Anand Nagar, NAGPUR COA- CA05/37206 Lic No.-NM.C/R.412, NI.T/R-2170 Yours Faithfully (RUPESH ANANTRAO RANGARI) Signature &Name( IN BLOCK LETTERS 0of L.S/Architect (license No- NI.TIR- 2170 ) Agreed and Accepted by For Shreekrishana Infraventure Partner Signature of Promoter Name Shreekrishna Infraventure Partners. Date